List of Services
-
Whittington Health NHS Trust – Backlog Maintenance ContractsList Item 1
Completed in 2018, the scheme consisted of 3 main areas of work, all undertaken in live hospital environments with maximum sensitivity to patients and ongoing care they receive.
-
Coventry Health Centre, Clay LaneList Item 2
Completed in April 2017, Hanevo undertook turnkey delivery of a significant refurbishment at the Coventry Health Centre. This involved development of an 8500 sq. ft. space on the 1st floor of a live Health Centre, converting a GP and Dental Practice into a new Satellite Renal Dialysis Treatment Centre.
-
Renal Dialysis Projects – Nationwide (5 schemes)
We have successfully delivered full turnkey projects across the UK for our Client covering Renal Services in: Northampton; Kettering; Grantham; Newcastle & Peterborough.
-
Cantel Medical Enabling Projects
Hanevo has worked successfully with specialist healthcare equipment providers Cantel to enhance their offering to turnkey installation solutions for various NHS Trusts, including:
-
Whittington Health NHS Trust – Critical Refurbishment Projects
Completed in Summer 2020, we undertook a variety of works to the accommodation block, whichprovides living space for over 100 nurses and on- call staff and 2 floors of offices. Works were planned around the daily lives of residents and users, with activities timed to accord to varied shift patterns.
List of Services
-
Private Pumping StationsList Item 1
Wessex Water were required to adopt all private pumping stations under Section 105a of the private sewer of the Private Sewer Transfer Regulations, across their operating region, which required survey and then upgrades to an adoptable standard.
-
Chertsey STW Operational ResilienceList Item 2
Following a process risk review carried out by Thames Water, it was highlighted that there was insufficient process resilience on site in the event of any type of failure of to one of the existing belt presses.
-
Event Duration Monitoring
Wessex Water identified 214 assets across their operating region, which required upgrades to their spill monitoring equipment to measure performance enabling them to maintain compliance with environmental consents across a variety of assets included Combined Sewer Overflows, Sewerage Pumping Stations & Sewage Treatment Works.
-
Tidworth WwTW
In December 2017 the Environment Agency made two significant changes to the discharge licence at Tidworth WWTW, which was originally constructed in the 1940’s.
-
Heathrow Moving Bed Biofilm Reactor
Veolia were required to construct an MBBR (Moving Bed Biofilm Reactor) plant located on the periphery of Heathrow Airport, as part of a scheme to upgrade the pollution control system on the eastern balancing reservoir.
List of Services
-
Galliford Try - Southern WaterList Item 1
As part of Southern Water’s ongoing
environmental legislation obligations, main contractor Galliford Try were contracted to undertake asset upgrades to 22 sites across the South East operating region.
-
Tidworth WwWT - VeoliaList Item 2
Works included all temporary works to form wall, including falsework & the formwork, angled propping & proprietary access platforms for pouring.