Completed in April 2017, Hanevo undertook turnkey delivery of a significant refurbishment at the Coventry Health Centre. This involved development of an 8500 sq. ft. space on the 1st floor of a live Health Centre, converting a GP and Dental Practice into a new Satellite Renal Dialysis Treatment Centre.
Programme was essential with commitments to prearranged critical appointments for dialysis treatment in the new centre. The Health Centre remained live throughout the works, with our operations directly above the main entrance, health centres, surgeries etc.
Works involved: Full soft strip of furnishings and equipment; Builders work andremodelling through structural works; Install of specialist RO plant; Full M&E install and integration into existing systems; backup generators during the works; fire protection works; toilet core fit out; new ceilings, partitions and floor finishes; Carpentry, decoration and FFE.