Work Concludes at Woodlands Edge
July 23, 2020
Work Concludes at Woodlands Edge for HANEVO
Work has concluded for HANEVO at Woodlands Edge SPS on behalf of Wessex Water.
The project includes the Installation of new wet well, new pumps and pipework and the backfill of an old wet well.
Also installed was a new kiosk base and kiosk complete with pump panel and telemetry. Further installation of chains / floats and technocover onto a concrete slab - complete with davit socket rounded off this phase.
NICEIC certificate produced and Davit lifting socket load tested and certificate provided in the O&M.