D Block Goods Lift Replacement - St Helier Hospital
Completed in December 2025, Hanevo delivered the replacement of the D Block goods lift at St Helier Hospital to restore critical access to basement plant and storage areas.
The project involved extensive structural alterations to the existing lift shaft to accommodate a new 1000kg chain-driven electric goods lift with additional landing levels.
The works were coordinated around ongoing hospital operations in adjacent and occupied areas.
Works included:
- Installation of protective hoardings and full-height shaft scaffold
- Strip-out of existing lift equipment and shaft preparation works
- Structural alterations and formation of new landing openings
- Waterproofing and fire protection works within the lift shaft
- Installation of new 1000kg chain-driven electric lift and landing gates
- Electrical upgrades, shaft lighting installations and LOLER certification