Chemical Storage Tanks Replacement – Westbury STW & Thingley STW
Hanevo completed the ‘Chemical Dosing Tanks Replacement’ project in Winter 2023, totalling circa £140k.
This project covered two sites in the North Wessex Patch – Westbury STW and Thingley STW.
Hanevo were acting as Principle Contractor and the works comprised M&E and Civils – namely the disconnection, removal, disposal of existing chemical storage tanks - along with the transportation, installation and commissioning of 2 x new Ferric Storage Tanks on each site.
Our programme was developed to enable the two sites to run concurrently, by utilising reliability periods to fully optimise install durations.
Ensuring compliance to all required specifications and regulations, Hanevo completed all works to programme and in budget. Further to the success of this project, Hanevo have since been awarded Saltford Chemical Storage Tank Design and Installation works.
Jamie Tate, Electrical & Commissioning Engineer at Hanevo noted “This was an exciting and rewarding project to be involved in, involving crane lifts, chemical disposal, and specialist material supply. We look forward to the successful delivery of the Saltford project and similar future projects.”