Event Duration Monitoring (U_MON 1)

Throughout AMP 7 (Year 2 and 4) and continuing into AMP 8, Hanevo have been awarded several Multi-Site EDM MON 1 Contracts, Covering more than 500 Sites, delivering for several key personnel within Wessex Water.


Contract values total more than £900k to date.


Works on these sites included;

  • Initial surveying – taking measurements and photos along with pricing 
  • Installation – of Ultrasonic Heads, Brackets, Control Units and Signage – Often involving Traffic Management & Confined Space Entries 
  • Commissioning – of installation and E2E testing with Wessex Water IS Department
  • Signage and Documentation – Production of an O&M manual with drawings / levels / NICEIC certificates and updating signage on site.
  • We are confident in our ability to deliver multi-site projects such as these, which are heavily planning and logistics focussed. 


Elizabeth Yates, Project Manager at Hanevo noted “Having delivered over 500 of these installations for Wessex to date, we are fully up to speed with requirements, specifications and products. We enjoy delivery of these multi-site projects, which blend careful programming / logistics and administration / documentation. Each site is fully closed out with an O&M within 5 days of completion”