Infrastructure Civils
Our team has a vast combined experience of over 50 years in civil engineering, utilities diversion and MEICA while our project team is made of individuals with the right experience, competence, attitude and drive to deliver maximum performance through all stages of the project.
- Mains Replacement
- New Connections
- Developer Services
- Civils, Ducts & Chambers
- Repair and construction of clean and wastewater infrastructure and non-infrastructure
Case Studies
Please scroll below for a list of our recent projects.
List of Services
-
Bellrock PLC. Coventry Health Care, Clay LaneList Item 1
Turnkey delivery of significant refurbishment at Coventry Health
Centre. Included development of an 8,500 sq. ft. space on the 1st floor of a
live Health Centre, converting GP and Dental Practice into a new Satellite
Renal Dialysis Treatment Centre.
-
Whittington Health NHS Trust Backlog MaintenanceList Item 2
Completed in 2018, this scheme was made up of 3 main phases of works, all
undertaken in a live hospital environment which demanded maximum sensitivity to
the patients and the ongoing care they required, as well as facilitating staff.
-
Whittington Health NHS Trust Fire RemediationList Item 4
Following success of the backlog maintenance scheme (see above),
awarded this project to upgrade fire protection to the ageing hospital.
Due for completion in October 2019, works are carefully programmed around
live ward access to ensure full hospital operation as usual and the comfort of
patients. Much of the works are out of hours and planned around clinical
care needs. Project is divided into 4 main parts.
-
Heathrow MBBR Replacement of Mechanical Equipment
Assembly and installation of over 1600no. free issue stainless steel aeration diffuser heads in 2 recently installed 15m diameter glass fused steel MBBR aeration tank.
Installation of all associated PVC pipework between diffusers and stainless steel pipework to connect to the aeration blowers.
-
South East Water (various sites) Live Process Plants
Full compliance planning and process risk assessments undertaken alongside client team and principal contractor, operators and process scientists, to develop and implement a detailed compliance plan covering all process risks.
Extensive sequential phased works to enable our installation, test and commission of a full new Profibus system.