The HANEVO culture is one of collaboration with our Clients and Suppliers enabling us to embrace the use technology and innovation in order to reduce carbon footprint, improve project efficiencies and minimise total expenditure [Totex]. This also likes with our commitment to work to deliver Beyond Net Zero by 2030 in line with the construction sectors aspirations.
Our Clients are met with a passionate and professional approach, reflecting the dedication of HANEVO to building progressive, long-term client relationships.
At HANEVO we pride ourselves on our flexibility and resilience to overcome whatever challenges each project may have, this is evidenced by implementation of strict protocols by all of our employees and supply chain to ensure our continued high level delivery on critical projects during the COVID-19 pandemic.
HANEVO has experience working with clients ranging from SME’s to public bodies and blue chip companies, resulting in high levels of repeat business.
Wessex Water were required to adopt all private pumping stations under Section 105a of the private sewer of the Private Sewer Transfer Regulations, across their operating region, which required survey and then upgrades to an adoptable standard.
Following a process risk review carried out by Thames Water, it was highlighted that there was insufficient process resilience on site in the event of any type of failure of to one of the existing belt presses.
Wessex Water identified 214 assets across their operating region, which required upgrades to their spill monitoring equipment to measure performance enabling them to maintain compliance with environmental consents across a variety of assets included Combined Sewer Overflows, Sewerage Pumping Stations & Sewage Treatment Works.
In December 2017 the Environment Agency made two significant changes to the discharge licence at Tidworth WWTW, which was originally constructed in the 1940’s.
Veolia were required to construct an MBBR (Moving Bed Biofilm Reactor) plant located on the periphery of Heathrow Airport, as part of a scheme to upgrade the pollution control system on the eastern balancing reservoir.
Site designed, built and powered by Halo Marketing Solutions.