<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>5c7acd3f</title>
    <link>https://www.hanevo.com</link>
    <description />
    <atom:link href="https://www.hanevo.com/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>Wessex Water award EDM ‘Mon 6’ Contract to Hanevo</title>
      <link>https://www.hanevo.com/wessex-water-award-edm-mon-6-contract-to-hanevo</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Wessex Water award EDM ‘Mon 6’ Contract to Hanevo
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Wessex-Water.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award of the “
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           MON6 M&amp;amp;E Installations Programme
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           ”
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
            
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Contract to Hanevo – awarding all 4 lots – North / South / West and DSEAR. The Contract is awarded under the new 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           “AMP8 M&amp;amp;E Contractors Minor Works Framework Lot 1”.
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This project is to deliver on Wessex Water’s commitment to installing monitoring of its Emergency Overflows (EOs) over the next five years (known as U_MON6). The works involve the installation and commissioning of ‘Event Duration Monitors’ to 300+ EO Sites. In addition, where there is a permitted Storm Overflow (SO) on the same site, a Flow Monitor will be installed to measure flows during discharge while Pressure Monitors will be installed to monitor rising main systems for blockages and bursts.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo will work in conjunction with other Wessex Water 3
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           rd
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            party contractors to co-ordinate on the Civil works, Traffic Management and Access due to some sites being in highways and on 3
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           rd
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            party land. A scoping programme is being rolled out initially to plan all relevant sites and associated technical details, which will form the basis of a phased logistical construction programme. All works are scheduled for completion by October 2028.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Elizabeth Yates, 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Project Manager for the Water Division / Wessex Water region noted:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “We are delighted with this new multi-year EDM award. It is great recognition of our previous delivery on multi-site EDM and S105 projects throughout AMP 7 and 8. Our team are well experienced in the project requirements including the quick turnaround of important validation documentation following installation. We look forward to continuing our fantastic working relationship with the Wessex Water team on this project”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 07 Apr 2026 22:05:47 GMT</pubDate>
      <guid>https://www.hanevo.com/wessex-water-award-edm-mon-6-contract-to-hanevo</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Wessex-Water.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO complete heavy lifting of new chillers at St Helier</title>
      <link>https://www.hanevo.com/hanevo-complete-heavy-lifting-of-new-chillers-at-st-helier</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO complete heavy lifting of new chillers at St Helier 
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have completed the lifting and placement of replacement chiller units at St Helier Hospital. As part of a wider scheme to replace aging cooling plant to critical areas, 3 No. new units have been installed on the Comms Room Roof with 2 No installed on the Women's Health building, in readiness for final connections and commissioning.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The crane lifts, utilising a 90t mobile crane, were undertaken on Sunday 29
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           th
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            March to align with the least busy times of the hospital estate. Co-ordination between the NHS Trust and HANEVO was essential to ensure that the lifts could continue efficiently around key areas of the estate, including directly outside the main pedestrian entrance to the hospital and key ambulance circulation areas.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Chiller units were pre-delivered earlier in the week under similar controls, ensuring that, on the day of the lift, necessary large vehicle movements were limited to the absolute minimum. The process will be repeated to remove redundant units once the new systems are up and running, ensuring continuity of critical services for the staff and patients in each facility.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Overseeing successful completion of the installation,
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Project Manager Mick O'Dea
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           "It was extremely satisfying to reach this key milestone on the project with a very smooth process on site. Thanks to all Trust stakeholders and our specialist suppliers in delivering these works with no inconvenience to the hospital users".
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Heavy+Lifting.png"/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 30 Mar 2026 14:07:36 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-complete-heavy-lifting-of-new-chillers-at-st-helier</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Heavy+Lifting.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>An Uplifting Saturday for HANEVO at Frimley Park Hospital</title>
      <link>https://www.hanevo.com/frimley-park-hospital</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           An uplifting Saturday for HANEVO at Frimley Park Hospital
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have successfully completed a major milestone on our project from Frimley Health NHS Foundation Trust, with the installation of the new Air Handling Unit on the roof adjacent to the Theatre 7 being upgraded.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The installation of the new AHU was a significant challenge requiring extensive co-ordination and planning with many stakeholders.  Owing to site constraints, with a landlocked site at the centre of the live hospital estate, and significant unit weights being installed, several lifting solutions were investigated, including serious consideration of a helicopter lift.  Working closely with our specialist crane providers, we developed a solution involving a 300t mobile crane with fly-jib attachment, lifting units weighing over 1.5t at a 77m radius over the live hospital estate.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Planning and co-ordination work by HANEVO and the Trust required clearance of the waste compound yard, planning of bin movements, traffic management around road closures on the estate, as well as co-ordination with the air ambulance helicopter service on the site.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           In planning the works, we worked closely with the AHU suppliers to optimise the section sizes to suit available crane capacity, including removal of cooling coils and fans to be lifted separately to bring weights down to an acceptable limit.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           To minimise disruption and impact, the crane lift was carried out over a full Saturday.  The 300t crane required a smaller mobile crane to install the fly jib and complete rigging, a 3 hour operation, with a strategically timed delivery of the sectional AHU in its enclosure to minimise road closure time and impact on traffic flow.  The AHU was lifted in 3 main component sections, with 7 additional lifts of smaller plant and ductwork undertaken.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Commenting on the project,
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Pre-Construction Director Jozef Mountain
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “this complex lifting operation was months in the planning, and it was incredible to see the scale of the operation in full flow on site.  We cannot understate the significant input of all parties, from our client at Frimley Health NHS Foundation Trust and their many stakeholders, through to out equipment and plant providers, in ensuring that this challenging and critical stage of the project was completed successfully and safely.  This is a true example of successful collaboration across a full project team”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Frimley+1.png" alt=""/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Frimley+3.png" alt=""/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Frimley+2.png" alt=""/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 25 Mar 2026 15:34:43 GMT</pubDate>
      <guid>https://www.hanevo.com/frimley-park-hospital</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Frimley+1.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Shepton STW Chemical Storage Tank Wessex Win for Hanevo</title>
      <link>https://www.hanevo.com/shepton-stw-chemical-storage-tank-wessex-win-for-hanevo</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Shepton STW Chemical Storage Tank Wessex Win for Hanevo
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/shepton-mallet-wrc.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award of the “
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Shepton Mallet Purisol Tank” 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Contract to Hanevo.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This Contract is awarded under the new 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           “AMP8 M&amp;amp;E Contractors Minor Works Framework - Lot 1”. 
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This project requires Hanevo to act as Principal Contractor to complete Civil, Mechanical, Electrical and Commissioning works, to install a new Purisol Tank and associated M&amp;amp;E Installation onto a designated existing / unused sludge drying bed area, which will replace the existing aging Tank setup currently located elsewhere on site, with full removal and disposal of existing upon completion and commissioning.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have also recently been awarded the Saltford Tanks x 4 replacement project, which we will be considered when programming the works to gain efficiencies between both projects. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Simon Longley, Contracts and Technical Manager at Hanevo noted 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “This award is greatly received from Wessex Water, especially following the recent Saltford Tanks award. We look forward to successful delivery of both these projects, working closely with Wessex Water and our 3
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           rd
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            party suppliers.”
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This project commences March 2026.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 25 Feb 2026 12:04:56 GMT</pubDate>
      <guid>https://www.hanevo.com/shepton-stw-chemical-storage-tank-wessex-win-for-hanevo</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/shepton-mallet-wrc.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>St. Georges Hospital washroom project reaches mid-way point for HANEVO</title>
      <link>https://www.hanevo.com/st-georges-hospital-washroom-project-reaches-mid-way-point-for-hanevo</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            St. Georges Hospital washroom project reaches mid-way point for HANEVO
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Internal.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           A project to refurbish 20 public and staff washrooms at St Goerge’s Hospital in Tooting has reached the halfway stage.  HANEVO are delivering the full refurbishment of all toilets and shower rooms across a variety of areas of the large healthcare estate.  Works are being undertaken to a variety of male, female and accessible facilities in a carefully phased approach to maintain adequate provision to patients, visitors and staff as we work in each area.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works include the full strip-out or each area, with new waterproofing works, floor and ceiling finishes and a combination of decorations and hygienic cladding to the walls.  New IPS units and sanitaryware are being provided, with electrical upgrades including new lighting and hand dryers, and mechanical works undertaken to ensure compliance to the overarching water safety strategy.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Project Manager Mick O’Dea noted
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “These works are spread across a very large healthcare site and require significant material movement to and from the workspace, which is carefully co-ordinated around the hospital to prevent intrusion.  A challenging programme requires us to complete around four washrooms every two weeks.  We are very pleased with how the project is progressing and the quality standards being achieved are extremely high”. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 24 Feb 2026 11:26:27 GMT</pubDate>
      <guid>https://www.hanevo.com/st-georges-hospital-washroom-project-reaches-mid-way-point-for-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Internal.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO approaching the latter stages of the MAU &amp; Maternity Development at Epsom General Hospital</title>
      <link>https://www.hanevo.com/hanevo-approaching-the-latter-stages-of-the-mau-maternity-development-at-epsom-general-hospital</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;a href="null" target="_blank"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            HANEVO approaching the latter stages of the MAU &amp;amp; Maternity Development at Epsom General Hospital
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Epsom+General+Hospital.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO’s project to re-configure the maternity ward at Epsom General Hospital has reached a key milestone with the completion of a new delivery suite.  The project, for Epsom &amp;amp; St Helier University Hospitals NHS Trust, is being delivered to overcome challenges  faced by the maternity department to increase their capacity so they can continue to provide the exemplary care well into the future.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works involve the creation of a new delivery suite, a Maternity Assessment Unit, 2 new triage rooms, new waiting areas, public toilets and reconfiguration of several offices and kitchen spaces.  Significant upgrades are being made to electrical infrastructure to accommodate, with the change-over of main switchboards and distribution boards.  New medical gas is being provided in many spaces, with proprietary bed-head trunking and new fabric finishes throughout.  Additionally, the opportunity is being taken to upgrade fire compartment performance including new doors and alterations to access controls.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           HANEVO Senior Analyst &amp;amp; Project Co-ordinator Tom Hanley
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “This complicated multi-phased project builds upon the excellent working relationship we have with the Epsom &amp;amp; St Helier Trust.  With a well-established collaborative approach across all teams, we are putting into practice exemplary construction delivery. We are doing this while accommodating the needs of all users around us including patients to staff. With our client, we are delivering a strategic approach to the phasing of the works that ensures care provision is maintained at the capacity needed throughout” 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 23 Feb 2026 11:36:31 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-approaching-the-latter-stages-of-the-mau-maternity-development-at-epsom-general-hospital</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Epsom+General+Hospital.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>UCLH Appoint HANEVO to deliver LED lighting efficiency programme of works</title>
      <link>https://www.hanevo.com/uclh-appoint-hanevo-to-deliver-led-lighting-efficiency-programme-of-works</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;a href="null" target="_blank"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            UCLH Appoint HANEVO to deliver LED lighting efficiency programme of works
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Reception.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO are delighted to confirm that we have been appointed to deliver the installation of over 4,500 light fittings in the Macmillan Cancer Centre at the heart of the University College London Hospitals NHS Foundation Trust estate in central London.  The works are being undertaken to improve energy performance efficiency, replacing aging light fittings across the entire building.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Already well progressed in the planning stage, we are undertaking collaborative surveys and developing solutions together with the team to ensure that all users and patients across the 8 floors of the building are put first in how we work.  The scheme will commence on site in the next few weeks, delivered by our in-house electrical expert resource and working closely with the lighting suppliers and facilities management team throughout over a six-month period on site.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Commenting on the award, Pre-Construction Director Jozef Mountain stated 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “We are delighted to have been chosen to partner with UCLH in the delivery of this scheme.  We have been selected for our proven ability to work flexibly across multiple live areas of a hospital whilst ensuring that the patient and user experience is enhanced throughout.  Communication and collaboration is key and we have been working closely together with the full UCLH team to carefully plan the best approach to the works.  This project is our first of what we hope will be many working for such a prestigious NHS Trust across their estate”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 23 Feb 2026 11:24:57 GMT</pubDate>
      <guid>https://www.hanevo.com/uclh-appoint-hanevo-to-deliver-led-lighting-efficiency-programme-of-works</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Reception.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Two New Emergency Lighting projects awarded to HANEVO at Epsom &amp; St Helier</title>
      <link>https://www.hanevo.com/two-new-emergency-lighting-projects-awarded-to-hanevo-at-epsom-st-helier</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;a href="null" target="_blank"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            Two New Emergency Lighting projects awarded to HANEVO at Epsom &amp;amp; St Helier
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/St+Helier.png.jpeg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           We are delighted to confirm that HANEVO have been recently awarded two lighting replacement projects by Epsom &amp;amp; St Helier University Hospitals NHS Trust, across the ground and second floors of the Wells Wing at Epsom General Hospital, and to Lombard road, a satellite ambulance facility. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Both projects comprise the replacement of existing general and emergency lighting with a full “SmartScan” technology energy saving system.  Bulk battery replacement is also being undertaken to extend the lift of all fittings to the maximum time possible.  All works are due to commence in mid-March 2026 on site, working around live areas of both buildings and requiring careful co-ordination with users and strict infection control measured to be implemented.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Commenting on award, Procurement Manager Grainne Hanley stated
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “It is excellent news to have been awarded further work with the Epsom &amp;amp; St Helier Trust across their estate.  This award follows our recent appointment to deliver the installation of over 4,500 light fittings in the Macmillan Cancer Centre at the heart of the University College London Hospitals NHS Foundation Trust estate in central London.  These projects are being delivered in partnership with our well established and highly trusted supply chain partners, all of whom have worked tirelessly with Hanevo and the Trust to build a values and partnering based approach to delivery”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Sun, 22 Feb 2026 11:39:39 GMT</pubDate>
      <guid>https://www.hanevo.com/two-new-emergency-lighting-projects-awarded-to-hanevo-at-epsom-st-helier</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/St+Helier.png.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Award of Saltford STW Chemical Storage Tanks</title>
      <link>https://www.hanevo.com/award-saltford-stw-chemical-storage-tanks</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Award of Saltford STW Chemical Storage Tanks
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Saltford+copy.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the order for the “
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Saltford Chemical Tank Replacements” 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Contract to Hanevo. The Contract is awarded under the new 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           “AMP8 M&amp;amp;E Contractors Minor Works Framework - Lot 1”. 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The project requires Hanevo to act as Principal Contractor to complete Civil, Mechanical, Electrical and Commissioning works, to replace the existing 4 x aging chemical dosing tanks with new.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Sequencing is crucial to ensure there is continuous dosing available throughout the replacement period and involves modifying the existing pipework and valving arrangements to allow for pairs of tanks to be replaced at a time. This will also future proof the system in the event that any one tank needs to be removed individually if ever required in the future.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This award follows the success of similar projects in 2023 at Westbury and Thingley. In parallel with this Saltford order, HANEVO have also recently been awarded the Shepton Tanks project, which has similar requirements and both awards allows for efficient coordination between both projects. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
            
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Jamie Tate, Electrical &amp;amp; Commissioning Engineer at Hanevo noted 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “This is a complex but exciting project to be involved in, involving crane lifts of the new tanks, specialist chemical disposal and material supply, with integration of the new assets into the existing system. We look forward to successful delivery.”
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This project commences March 2026.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Sat, 21 Feb 2026 11:56:30 GMT</pubDate>
      <guid>https://www.hanevo.com/award-saltford-stw-chemical-storage-tanks</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Saltford.jpg.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Theatre 7 Refurbishment at Frimley Park Hospital</title>
      <link>https://www.hanevo.com/theatre-7-refurbishment-at-frimley-park-hospital</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Theatre 7 Refurbishment at Frimley Park Hospital
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/External.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO are currently delivering the new Theatre 7 refurbishment for Frimley Health NHS Foundation Trust.  The works will provide a modern operating theatre on the 1
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           st
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            floor of the main building, helping the Trust to continue its provision of exemplary clinical care.  The new theatre contains new specialist medical equipment including operating lights, surgeons panel and medical gas pendants, as well as a full replacement of all infrastructure including a new AHU to ensure HTM compliance in performance.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works are well progressed on site, with all contractor design elements completed and 1
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           st
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            fix mechanical and electrical well underway.  The old AHU has been removed, and we will be installing a new steel platform in the next 2 weeks above the plantroom roof, ahead of delivery of the new external AHU.  Works to install this will involve a complex crane lift which is being carefully co-ordinated around estate access needs and air ambulance movements. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           A tight programme is being adhered to whilst meticulously planning and controlling the works to mitigate any impact on user convenience or patient safety in the occupied wards around us.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Commenting on the project, Project Manager Richard Gray stated
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “we have already established a trusting relationship with the Trust project team and are excited to be showcasing our approach to best practice healthcare construction for this new client.  We are working well together to overcome significant logistical challenges, not least the complex crane lift required in mid-March which requires significant collaborative planning by all stakeholders”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 20 Feb 2026 11:04:26 GMT</pubDate>
      <guid>https://www.hanevo.com/theatre-7-refurbishment-at-frimley-park-hospital</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/External.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO awarded place on Wessex Water AMP8 ‘Design &amp; Build Contractors (Minor Works)’ Framework</title>
      <link>https://www.hanevo.com/hanevo-awarded-wessex-water-amp8-framework</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           HANEVO awarded place on Wessex Water AMP8 ‘Design &amp;amp; Build Contractors (Minor Works)’ Framework.
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO has been awarded a place on the Wessex Water multi-million-pound AMP8 “Design &amp;amp; Build Contractors (Minor Works)” Framework Agreement – Lot 1 – Non-Infrastructure Works (Potable Water and Wastewater). 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This Capital Investment Framework Programme will include New Works, Refurbishments, Replacements and Maintenance works. The Framework activities involve core capabilities such as; Project and Commercial Management, Procurement, Design, Construction and Installation, Commissioning and Decommissioning.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This new success is in addition to the earlier award to Hanevo of the “AMP8 M&amp;amp;E Contractors Minor Works” and “AMP8 M&amp;amp;E Support” Frameworks, both of which were recently announced by Wessex Water.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Hanevo Project Manager, Elizabeth Yates
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           , explained “The whole HANEVO team are delighted with this new Framework award. It is great recognition for all our projects delivered for Wessex Water throughout AMP 7. Working alongside our Technical and Contracts Manager, Simon Longley, and our dedicated Wessex Water team is a pleasure, and we are very much looking forward to a busy AMP8 delivering safe, reliable, quality work”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Hanevo Electrical / Commissioning Engineer, Jamie Tate
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            noted
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “Wessex Water is a key client for HANEVO and our hard work has resulted in a fantastic reputation within Wessex Water. The 3 new AMP8 Framework awards are a great achievement and will allow us to build on our resources, experience, and further grow our already great relationship with Wessex Water”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 09 Oct 2025 09:41:53 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-wessex-water-amp8-framework</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/md/pexels/dms3rep/multi/pexels-photo-612341.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hanevo Support St Joseph’s Foundation Golf Classic</title>
      <link>https://www.hanevo.com/hanevo-in-the-community</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Hanevo Support St Joseph’s Foundation Golf Classic
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Dairy+Ireland.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Pictured above are the Hanevo team of Michael Browne, Tom Hanley and Liam McCarthy who took part in the recent 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           St Joseph’s Foundation
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
            Charity Golf classic where the amazing sum of €13,456 was raised. This was as part of the St. Joseph's “Drive for a difference” programme. The money will go towards improving the outdoor space at St Joseph’s main Campus in Charleville. To gain a better understanding of just how important the work St Joseph’s Foundation does, please visit 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://www.sjf.ie" target="_blank"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            sjf.ie
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
            
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Grainne Hanley, Commercial &amp;amp; Procurement Manager for Hanevo explained “The work undertaken by such organisations and their people is an inspiration to all of us at Hanevo. We are in awe of their dedication to improve the lives of others”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 19 Sep 2025 11:54:55 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-in-the-community</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Dairy+Ireland.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>AMP8 Pump Stations Award for Hanevo</title>
      <link>https://www.hanevo.com/amp8-pump-stations-award-for-hanevo</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           AMP8 Pump Stations Award for Hanevo
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award of the S105A “
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Private SPS Transfer Minor Improvements 25/26” 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Contract to Hanevo.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This Contract is being undertaken under the new 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           “AMP8 M&amp;amp;E Contractors Minor Works Framework Lot 1” 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           delivery route.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The project comprises Civil, Mechanical, Electrical and Commissioning works, to upgrade 13 No. newly adopted ‘S105a Private Pumping Stations’ to Wessex Water standards. Due to the nature of these sites, where locations are usually in and around customers properties, the construction programme has been carefully planned and resourced. The programme has been developed to ensure that Hanevo, our supply partners and Wessex Water 3
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           rd
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            Parties work efficiently to meet the delivery dates, while ensuring minimal disruption to customers. Work commences on site in September and runs for 12 weeks.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO is a recognised Industry leader in managing multi-site schemes of this nature, with proven delivery on previous Wessex Water projects including over 100 No. Private Pumping Station Upgrades and well over 200 No. EDM Installations throughout the AMP7 ‘EM&amp;amp;I Framework’ period. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Richard Gray, 
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Electrical Engineer for the Wessex region noted:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “This new contract is a fantastic way for Hanevo to begin AMP8 and is a great compliment following our previous successes in the S105a Private Pumping Station work stream. We are working to a complex programme, with several parties involved, including Wessex Water customers, so up-front planning has been crucial. We look forward to the successful delivery of these sites”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 19 Sep 2025 11:48:21 GMT</pubDate>
      <guid>https://www.hanevo.com/amp8-pump-stations-award-for-hanevo</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/AMP8.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Reach for The Sky at St Helier Hospital</title>
      <link>https://www.hanevo.com/hanevo-reach-for-the-sky-at-st-helier-hospital</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           HANEVO reach for the sky at St Helier Hospital
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo-46746e18.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            HANEVO are well advanced on works to refurbish a 40m high chimney at the heart of St Helier Hospital.  The project required the installation of scaffolding around the top of the chimney while utilising rope access techniques to undertake the works.  Brickwork repairs are almost complete and will continue with weatherproof sealing and full replacement of the lighting protection system to ensure the Chimney remains safe long into the future. Enhanced security and protection measures are in place for the duration of the works to ensure public safety at all times. 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Commenting on the project,
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Contract Director Jozef Mountain
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            stated "
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO are excited to be able to showcase our construction and project management skills on a structure with such challenging access and safety requirements. Work with the Trust Personnel during the pre-planning on this project was meticulous with safety metrics being a key KPI . We are expecting works to complete on programme within the next 2 weeks.  We would like to thank our specialist partner on this project, Cedars Steeplejacks (Midlands) Ltd who have proven to be expert in their field and a pleasure to work with”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 29 Aug 2025 13:04:51 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-reach-for-the-sky-at-st-helier-hospital</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/PHOTO-2025-08-21-13-16-28.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hanevo Awarded Equine Therapy Hub Expansion</title>
      <link>https://www.hanevo.com/hanevo-awarded-equine-therapy-hub-expansion</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Hanevo Awarded Equine Therapy Hub Expansion
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Unknown.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO are pleased to have been awarded the contract to construct new facilities at the Equine Therapy Hub in Kilcloon, Co. Meath. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The hub, run by Stewarts Care, provides an equine assisted therapeutic service for children and adults with autism and intellectual and physical disabilities in Meath, Dublin, and Kildare. Equine therapy leverages the unique environment and interaction with horses to provide therapeutic benefits targeting physical, sensory, emotional, neurological, educational, and psychosocial goals, and is a vital service for the local communities.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO will be constructing a new 14-bay stable building, with a steel frame and specialist equestrian facilities within, as well as a new equestrian arena, bunded viewing area, specialist equestrian fencing and all associated landscaping and drainage works. Currently in the pre-construction design phase, the works are programmed to commence on site in July and are expected to take 5 months to complete.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Pre-Construction Director Jozef Mountain commented 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           "HANEVO are delighted to have been awarded the contract to construct and upgrade the existing equestrian facilities. We are excited to be helping Stewarts Care in expanding their unique services that provide an invaluable asset to children and adults with additional needs in the area. It expands on our portfolio of education and care sector works in Ireland and is an excellent opportunity to showcase the success of our collaborative approach with our clients and their stakeholders". 
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 19 Jun 2025 08:32:33 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-equine-therapy-hub-expansion</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Unknown.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO awarded place on Wessex Water  ‘M&amp;E Contractors (Minor Works)’ Framework.</title>
      <link>https://www.hanevo.com/wessex-water-framework</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           HANEVO awarded place on Wessex Water ‘M&amp;amp;E Contractors (Minor Works)’ Framework.
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO has been awarded a place on Wessex Water’s Mechanical &amp;amp; Electrical (M&amp;amp;E) Minor Works Framework. Working with YTL Construction (UK), the framework agreement will support the delivery of Wessex Water’s capital maintenance and capital investment programme for AMP8. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO are awarded to Lot 1 – M&amp;amp;E Contractors Minor Works, which includes MEICA and associated civils works on projects that include new, refurbishment or replacement and maintenance works.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Having been included on previous AMP7 ‘EM&amp;amp;I’ and ‘M&amp;amp;E Support’ Frameworks, HANEVO have proven to be a trusted supplier to Wessex Water for many years.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Elizabeth Yates and Simon Longley, together with our dedicated team, have overseen the building of the HANEVO capability in the Wessex Water region over AMP7 and are delighted to have that long term approach rewarded with this new framework.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “Wessex Water is a key client for HANEVO and our hard work has resulted in us being selected for this framework. We are extremely proud of our reputation within Wessex Water and we are looking forward to a very busy AMP8 period” noted Elizabeth.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Simon added that,
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           “The award allows us to build on the resources we have. We have been building our delivery capability in the Wessex Water region over many years and this award will accelerate that work. We are delighted to have the opportunity to develop and grow our relationship with Wessex Water, whilst continuing to deliver safe, reliable, quality work”. 
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Link to article
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
              
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://www.constructionnews.co.uk/contracts/wessex-water-appoints-45-firms-to-minor-me-works-framework-07-05-2025/" target="_blank"&gt;&#xD;
      
           https://www.constructionnews.co.uk/contracts/wessex-water-appoints-45-firms-to-minor-me-works-framework-07-05-2025/
          &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 09 Jun 2025 21:22:18 GMT</pubDate>
      <guid>https://www.hanevo.com/wessex-water-framework</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/7.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>SEON Vision – Hanevo Build State of the Art Eye Clinic</title>
      <link>https://www.hanevo.com/seon-vision-hanevo-build-state-of-the-art-eye-clinic-now-providing-treatment-to-patients-in-the-kingston-community</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           SEON Vision - Hanevo Build State of the Art Eye Clinic now providing treatment to patients in the Kingston community.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/23+Kingston+Eye+Clinic.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           A state-of-the-art Eye Clinic is now providing treatment to support care provision in the Kingston-upon-Thames community. This follows the successful completion and handover of the new facility to our client, SEON Vision. Hanevo has built this eye clinic to the highest levels of quality. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Located in the heart of Kingston, the works completed by HANEVO demanded meticulous attention to detail to create the best possible patient experience. Inspired by the world-class centres where the surgeons trained, we collaborated with the client and architect to provide a space that promotes healing, safety, and efficiency. The Scandinavian-inspired design, soft colour palette, and floor-to-ceiling windows provide a calming atmosphere, with a circular, one-way patient route to ensure a seamless journey. 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Commencing from shell &amp;amp; core, the new facility includes a welcoming entrance, reception, main waiting and post procedure waiting areas. Clinical spaces include an Ophthalmic theatre (built to operating theatre standard), diagnostics room, minor operations room (which dual functions as consultation / examination room) and a Laser treatment room. Ancillary public and staff spaces complete the space.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The 5-month scheme was a full design and build approach and included the highest quality finishes throughout to meet the chosen aesthetic. Fitted furniture was specifically made to provide a focal feature whilst also complying with healthcare specifications and standards to ensure we met CQC requirements, a critical requirement to put the facility into use.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Originally the ground floor of a commercial unit, the building is was the heart of Kingston in a busy public realm, so coordination around existing property, pedestrian &amp;amp; traffic movement and occupants directly above and beside the works was carefully managed by our site team throughout all stages of the works. HANEVO works included:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Façade adaptions to integrate louvres and reduce solar gain to internal spaces.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            MVHR system to surgeries &amp;amp; circulation &amp;amp; VRF units to office space for comfort.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Full electrical works including feature architectural lighting &amp;amp; electrical outlets.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Partition walls &amp;amp; a combination of solid MF ceilings &amp;amp; suspended tiles, with large areas of hygienic wall coverings.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Bespoke joinery of the highest quality to reception areas &amp;amp; surgeries to meet CQC compliance whilst maximising aesthetics.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            High-quality tiling to floors &amp;amp; restrooms and specialist vinyl floor finishes to clinical spaces including the theatre.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            A combination of timber door-sets and specialist GRP door units to clinical space.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Integrated specialist medical equipment including installation of infrastructure, medical gas &amp;amp; associated plant, with coordination of installation by specialists.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Theatre fit-out including operating lights, surgeons panel, UPS and IPS pendants and associated equipment.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Operational since early 2025, the works have proven to be a significant success and meet exactly the client's aspirations and patient need in all aspects. Commenting on the involvement of HANEVO in the Project, Pre-Construction Director Jozef Mountain stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           "HANEVO are incredibly proud to have been an integral part of the team in realising our client's vision through the completion of design and the entire construction period. The attention to detail from all our team, direct and through our specialist supply chain, and the quality of the final facility handed over is truly exceptional. We would especially like to thank our clients cost consultants LH&amp;amp;E for their focus on budgetary and programme KPI’s, which helped us in ensuring the project was delivered on time and within budget. We are grateful that SEON Vision thanked HANEVO for our support and guidance in delivering this facility while noting it would not have been possible without the professionalism displayed by HANEVO throughout”.
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;&#xD;
      
            
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 06 Jun 2025 08:53:35 GMT</pubDate>
      <guid>https://www.hanevo.com/seon-vision-hanevo-build-state-of-the-art-eye-clinic-now-providing-treatment-to-patients-in-the-kingston-community</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/8+Kingston+Eye+Clinic.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>SMART Obstetrics Theatres for Epsom Hospital</title>
      <link>https://www.hanevo.com/smart-obstetrics-theatres-for-epsom-hospital</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           SMART Obstetrics Theatres for Epsom Hospital
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Obstetrics.jpeg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO are delighted to have completed our Obstetrics Theatres project, undertaken for Epsom &amp;amp; St Helier University Hospitals NHS Trust. The scheme was designed to improve patient treatment space for the maternity services that the Trust provide. The project was completed with no impact on the ongoing Maternity Ward service provision to an exemplary standard of finish.  Works involved the full repurposing of an existing recovery space into a HTM compliant SMART theatre and the conversion of the adjacent theatre into a SMART theatre. These provide the first SMART theatres across the Trust’s estate, providing new sensor technology and monitoring equipment to monitor environmental measures and implementing an 'automated set-back mode' which triggers when theatres are not operational, turning off devices and equipment to reduce energy use and extending associated plant life expectancy.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            All works were undertaken in the live Maternity ward, with careful control of the surrounding environment through extensive dust and aspergillus controls and consideration of user need throughout. At least one theatre remained operational for the full duration of the works, save for a strict 9-day window where alternative space was used to allow conversion of Theatre 1 to the SMART approach. Through meticulous planning, works were carefully co-ordinated with full stakeholder involvement throughout in a collaborative approach, including ward leads, nursing staff, estates management, fire officers, security teams and infection control. Extensive co-ordination of electrical shutdowns was an essential part of the works to maintain business as usual and patient safety as we brought the new equipment on-line. This involved several surveys, significant up-front planning, and temporary supplies to maintain essential equipment during such activity. This would not have been possible without our supply chain to whom we are very grateful.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
      
           Works included but were not limited to:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Installation of hygienic cladding and flooring, new ceilings, and doors.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Specialist medical equipment including new UPS &amp;amp; IPS supply, surgeons panel, IPS pendant and Operating Lights. 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            New small power, dimmable lighting and associated controls connected to the existing Gateway system.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Medical gas installations, fire alarms and BMS connectivity including SMART Theatre technology integration.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            New Trough sinks in IPS units.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Overhaul of the retained AHU that served both theatres, with new fans, dampers and ductwork to ensure HTM compliant airflow and heating/cooling performance and to meet the Trust fire strategy for occupant safety.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Full construction of a new external purpose-built extension on the floor below to house new UPS and controls and air conditioning equipment.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Commenting upon completion of the project, Epsom &amp;amp; St Helier Capitals Project Manager, stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           "I would like to take this opportunity to extend my sincere thanks to everyone involved in delivering this important and first maternity smart theatre project to our Epsom Hospital. This achievement reflects the collective effort, expertise, and dedication of all parties, and I would like to acknowledge and express our gratitude to HANEVO, our principal contractor, for their professional management and delivery of this very challenging project.  This has been a truly collaborative effort, and we are proud of what we have accomplished together in support of patient care and service improvement."
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 04 Jun 2025 08:46:38 GMT</pubDate>
      <guid>https://www.hanevo.com/smart-obstetrics-theatres-for-epsom-hospital</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Obstetrics.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Proud Sponsors of the GESH Care Awards 2024</title>
      <link>https://www.hanevo.com/sponsors-gesh-care-awards-2024</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Proud Sponsors of the GESH Care Awards 2024
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo-24ca1657.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Pictured from left to right Mick O’ Dea, Myleene Klass, Joe Mountain and John Buckley
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO were delighted to be given the opportunity to support the GESH Care Awards 2024 as one of the key category sponsors of the event. These awards celebrate the best of GESH, providing an opportunity to highlight and thank some of the key teams and individuals that make up over 17,000 staff across the St George's, Epsom &amp;amp; St Helier University Hospitals &amp;amp; Health Group within the NHS.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Attending the awards for HANEVO were Board Advisor John Buckley, Construction Manager Mick O'Dea and Pre-Construction Director Jozef Mountain, where HANEVO sponsored the 'Collaboration and Partnership' category award, ultimately won by the Banstead Integrated Community Services team, praising their transformative approach to community care.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Commenting on the awards,
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           Jozef Mountain
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           "It was a privilege to be invited to celebrate with some of the most selfless and professional teams and individuals in the NHS, who's commitment to ensuring that patient care is at the centre of all they do cannot be commended enough. It was fitting for HANEVO to sponsor this category, as it is integral to what we do when working with the Trust: We see first-hand the exemplary approach to collaboration and partnership in all of the teams we work with across the Trust's estate. And of course, who could give up the opportunity for the odd celebrity photo!"
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 17 Dec 2024 16:12:37 GMT</pubDate>
      <guid>https://www.hanevo.com/sponsors-gesh-care-awards-2024</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo-24ca1657-bf1f8fcb.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>EDM Advanced MCerts Award – Westwood WRC:</title>
      <link>https://www.hanevo.com/edm-advanced-mcerts-award-westwood-wrc</link>
      <description>Hanevo are delighted to have been awarded the Westwood WRC screening works electrical package, with the works to commence in mid-October.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           EDM Advanced MCerts Award – Westwood
          &#xD;
    &lt;/span&gt;&#xD;
    
          WRC:
         &#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo are delighted to have been awarded the Westwood WRC screening works electrical package, with the works to commence in mid-October.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The works will comprise the ele
          &#xD;
    &lt;/span&gt;&#xD;
    
          ctrical installation and commissioning of a new Huber Screening assembly installed by others. Works will also include EDM monitoring equipment, flow metering, penstock installation, lighting, and telemetry. 
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Commissioning is programmed to commence early November and will involve liaison with the Wessex Water Automation department, with Wessex Water acting as principal contractor for the project.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
      
           Simon Longley, HANEVO Contracts Manager
          &#xD;
    &lt;/span&gt;&#xD;
    
          , noted:
          &#xD;
    &lt;span&gt;&#xD;
      
           “Wessex Water have engaged with Hanevo to complete the Electrical and Com
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           missioning works on this project, as we have proven experience with them on previous EDM works and Huber screening installations. We look forward to commencing on site and completing another successful project for Wessex Water”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 01 Oct 2024 16:01:10 GMT</pubDate>
      <guid>https://www.hanevo.com/edm-advanced-mcerts-award-westwood-wrc</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/md/pexels/dms3rep/multi/pexels-photo-612341.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Awarded Roofing Project at St Helier Hospital</title>
      <link>https://www.hanevo.com/hanevo-awarded-roofing-project-at-st-helier-hospital</link>
      <description>HANEVO have been awarded a critical project to replace the roof coverings to the D Block at St Helier Hospital.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          HANEVO awarded roofing project at St Helier Hospital
         &#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/St+Hellier.jpeg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have been awarded a critical project to replace the roof coverings to the D Block at St Helier Hospital. Works are due to commence within the next 2 weeks, with e
          &#xD;
    &lt;/span&gt;&#xD;
    
          xisting roof finishes removed and a new specialist membrane applied. Repairs are also required to leadwork, parapets and copings, ensuring a water-tight structure for the patients and staff using the many clinical spaces within the building.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    
          Works are planned to be completed over a 2-month period, with minimal temporary works through use of proprietary working at height plant and equipment to ensure full operative safety.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          Commenting on the award
          &#xD;
    &lt;span&gt;&#xD;
      
           , Project Manager Mick O'Dea
          &#xD;
    &lt;/span&gt;&#xD;
    
          stated
          &#xD;
    &lt;span&gt;&#xD;
      
           "We are delighted to have secured another project for our long-term clients at this NHS Trust. It builds upon an excellent track record of refurbishment delivery and direct experience of the roofing products being used, having undertaken the same scope of works on other buildings across the estate".
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 16 Sep 2024 11:53:56 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-roofing-project-at-st-helier-hospital</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/St+Hellier.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Well Underway on Therapy Gardens for Epsom Hospital Patients</title>
      <link>https://www.hanevo.com/hanevo-well-underway-on-therapy-gardens-for-epsom-hospital-patients</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          HANEVO well underway on Therapy Gardens for Epsom Hospital Patients
         &#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Therapy+Garden.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have commenced works at Epsom General Hospital to transform a dedicated external space into an aesthetically pleasing Therapy Garden for patients to benefit from. With the project funded through charitable donations, HANEVO have worked closely with the Trust to make the project affordable using 3D and video representations and have offered direct support including the donation of some material elements.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Works involve a large volume of excavation works, with new planters and hard landscaping as well as ornamental features and seating. 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Commenting on site,
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Construction Manager Chris Jeffries
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            commented,
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            "We have progressed well on site and are undertaking the works carefully to accommodate the ongoing needs of a live healthcare estate. Quality will be ensured through the highly skilled and trained workforce that we have appointed on the scheme, and we are eager to see the first patients getting the benefits of this therapeutic external space, enhancing their care that is expertly provided by the Trust".
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 16 Sep 2024 11:48:05 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-well-underway-on-therapy-gardens-for-epsom-hospital-patients</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Therapy+Garden.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO awarded private Eye Clinic fit-out in London</title>
      <link>https://www.hanevo.com/hanevo-awarded-private-eye-clinic-fit-out-in-london</link>
      <description>HANEVO have been awarded the fit out, from shell and core, of a new privately run Eye Clinic in London. Commenced on site in June 2024, and being completed by November, the new facility will provide high quality ophthalmic clinic for use by the local community, giving greater choice to patients and complement the existing healthcare provision in the local area.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO awarded private Eye Clinic fit-out in London
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have been awarded the fit out, from shell and core, of a new privately run Eye Clinic in London. Commenced on site in June 2024, and being completed by November, the new facility will provide high quality ophthalmic clinic for use by the local community, giving greater choice to patients and complement the existing healthcare provision in the local area.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            With high quality finishes throughout to give an attractive aesthetic, the project involves the refurbishment of the ground floor of a commercial property and includes full new mechanical and electrical systems and material finishes in accordance with necessary Healthcare regulations. 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The completed facility will include a welcoming entrance, reception, main waiting and post-procedure waiting areas. Clinical spaces include an Ophthalmic theatre (operating theatre standard), diagnostics room; minor operations room (dual function as consult/exam rooms and a Laser treatment room, as well as all ancillary public and staff spaces.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Commenting upon commencement of works,
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Project Manager Mick O'Dea
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           "HANEVO are delighted to have been awarded this significant project to help provide greater care provision choice in the local area. It builds on our excellent track record of competing extremely high-quality schemes in both the private and public healthcare sectors over many years and we look forward to the challenges ahead in delivering an exemplary scheme for our client".
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 09 Aug 2024 09:43:16 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-private-eye-clinic-fit-out-in-london</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/pexels-photo-1796715.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Vale Road Sludge Screens</title>
      <link>https://www.hanevo.com/vale-road-sludge-screens</link>
      <description>Works are progressing on programme at Hanevo’s ‘Vale Road’ project - ‘Sludge Screening M&amp;E Works’.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Vale Road Sludge Screens
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Vale+Road.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works are progressing on programme at Hanevo’s ‘Vale Road’ project - ‘Sludge Screening M&amp;amp;E Works’.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This project commenced in March with Bartletts Civils acting as the Principle Contractor on site to complete their required civils works.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           With the civils completed early, Hanevo acquired the handover of PC Role / CDM Management from Mid May.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This project involves Fabrication, Mechanical, Electrical and Commissioning works - to install a new MCC &amp;amp; Kiosk, Access platform and Staircase, Strainpress Chutes, Break Tank, Various new pumps, pipework, valves and accessories with associated instrumentation.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
           Works are projected to complete in September 2024 and are on schedule.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Simon Longley, HANEVO Contracts Manager
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            for the Wessex region noted:
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “Thanks to the great collaboration between our valued Client’s team and our own Internal team, work is progressing extremely well, and we look forward to successful completion and handover”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 09 Aug 2024 09:35:31 GMT</pubDate>
      <guid>https://www.hanevo.com/vale-road-sludge-screens</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/VR1.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>EDM Advanced MCerts – North Nibley</title>
      <link>https://www.hanevo.com/edm-advanced-mcerts-north-nibley</link>
      <description>Hanevo has completed all civils and mechanical works at North Nibley – which is the first of two awarded EDM Advanced Contracts – the other being Wootton Bassett STW which commences Monday 12th August.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           EDM Advanced MCerts – North Nibley
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/North+Nibley.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo has completed all civils and mechanical works at North Nibley – which is the first of two awarded EDM Advanced Contracts – the other being Wootton Bassett STW which commences Monday 12
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           th
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            August.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo are acting as Principal Contractor to manage the Civil, Mechanical, Electrical and Commissioning works on both sites. Each site comprises the installation of Pumping Stations to divert the incoming flows, to avoid double counting flows at the inlet prior to MCerts flow meter. For these projects, Hanevo engaged in up-front design works, including attendance at Hazop and Design Review meetings, to assess buildability.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The driver for this project is significant pressure from Ofwat and the Environment Agency to demonstrate continuing compliances. Combining the EDMs on Spill to Storm being installed in AMP7, will enable Wessex Water to confirm that the permitted FFT for each WRC is being complied with. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Both sites are programmed and resourced, to completed at the end October 2024.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 09 Aug 2024 09:32:00 GMT</pubDate>
      <guid>https://www.hanevo.com/edm-advanced-mcerts-north-nibley</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/EDM1.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Shepton Mallett Blowers</title>
      <link>https://www.hanevo.com/shepton-mallett-blowers</link>
      <description>Works are nearing completion on site at our ‘Shepton Mallett Blowers’ project. The project comprises Mechanical, Electrical and Commissioning works, to install 5 new blowers and associated stainlesss steel pipework, valves and fittings.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Shepton Mallett Blowers
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Shepton+Mallet.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works are nearing completion on site at our ‘Shepton Mallett Blowers’ project. The project comprises Mechanical, Electrical and Commissioning works, to install 5 new blowers and associated stainlesss steel pipework, valves and fittings. The works are required due to age related issues, with focus on maintaining works process performance.
           &#xD;
      &lt;br/&gt;&#xD;
      
           works are progressing on programme with the first 3 blowers installed and commissioned. The remaining 2 blowers are being installed ready for commissioning by mid-August. The work is being undertaken while the plant continues to operate.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            This award follows the ongoing success of Bridport Blowers, which was successfully completed last month for Wessex Water.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Elizabeth Yates, HANEVO Project Manager
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            for the Wessex region noted:
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “In planning for this project, we were able to utilise the valuable experience gained on our recent Bridport Blowers project. We look forward to completing works and successful handover to our valued Client”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 09 Aug 2024 09:13:21 GMT</pubDate>
      <guid>https://www.hanevo.com/shepton-mallett-blowers</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Unknown-1.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hanevo Passes SafeContractor Audit</title>
      <link>https://www.hanevo.com/hanevo-pass-safecontractor-audit</link>
      <description>The Hanevo team is delighted to confirm our passing of the SafeContractor audit.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo Pass SafeContractor Audit
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            The Hanevo team is delighted to confirm our passing of the SafeContractor audit.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The SafeContractor accreditation aligns with the Common Assessment Standard (CAS) and supports CDM compliance. It covers quality management, environmental practices, health and safety, and social responsibility, enhancing reputation, building stakeholder trust, improving efficiency and mitigating risks.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 24 Jul 2024 12:48:30 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-pass-safecontractor-audit</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Social+Media-f62b24a9.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Awarded Grade 2 Listed Educational Works Contract</title>
      <link>https://www.hanevo.com/hanevo-awarded-grade-2-listed-educational-works-contract</link>
      <description>HANEVO have been awarded the full internal and external refurbishment of the Grade II Listed Heywood House Building for ACS International School in Cobham, Surrey.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Awarded Grade 2 Listed Educational Works Contract
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/HANEVO+awarded+Grade+2+Listed+Educational+Works+Contract-d7b2dfe4.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have been awarded the full internal and external refurbishment of the Grade II Listed Heywood House Building for ACS International School in Cobham, Surrey. These works follow the successful refurbishment works that HANEVO undertook to the West Lodge building on the same campus and highlight our successful approach to delivering to our client's needs, giving them the confidence to entrust us with this larger scale project at the heart of the school.  As party of the school’s development Masterplan, occupants moved out from the facility into the refurbished West Lodge, enabling Heywood House to be repurposed into educational space to benefit the students for the long term.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works commenced on site in November 2023 and have progressed at great pace, with extensive efforts to ensure that the needs of heritage bodies are accommodated in all that we deliver. We have progressed with the necessary strip-out works internally, with structural alterations and mechanical &amp;amp; electrical 1
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           st
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            fix well underway. Externally, full height scaffolding has enclosed the building, with refurbishment of the lime render, period timber sash windows, stonework and period features nearing completion on all elevations with scaffolding due to be removed in early March.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Going forward, a full fit out will be undertaken to all internal spaces, with a complete re-wire, new data, fire alarm and security works alongside a full new ventilation and heating strategy across both floors of the building. Feature glazed balustrading and a large volume of bespoke fitted furniture will be installed to provide a secure and adaptable teaching space that accommodate the constraints of a listed building setting. Significant efforts are being made to retain internal period features, including a strategy to work from above into floor voids to protect the integrity of decorative ceiling features and cornicing. Specialist contractors are engaged to upgrade the period timber doors and frames to meet improved fire protection whilst maintaining the aesthetic required to satisfy the heritage elements of planning approvals. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Commenting on the project, Hanevo Project Manager Michael O'Dea noted,
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “The award to HANEVO of this highly sensitive and prestigious project is testimony to the success we achieved on our last project at Cobham, in terms of high-quality product and delivery without disruption to the client's educational delivery. We look forward to delivering to the School's, and other stakeholders, exacting needs and are certain that the trust that the school have shown in HANEVO by awarding us this scheme will be rewarded. We are confident that the delivery of these works, at the very heart of the school and as a focal point of the campus, will be a success for all parties involved".
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 29 Feb 2024 14:03:47 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-grade-2-listed-educational-works-contract</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/HANEVO+awarded+Grade+2+Listed+Educational+Works+Contract-d7b2dfe4.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Bridport Blowers</title>
      <link>https://www.hanevo.com/bridport-blowers</link>
      <description>Hanevo are in the planning and procurement stage on the recently awarded project ‘Bridport Blowers’.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Bridport Blowers
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo are in the planning and procurement stage on the recently awarded project ‘Bridport Blowers’.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works comprise Mechanical, Electrical and Commissioning works, to install the new blowers and associated stainlesss steel pipework in a duty standby configuration. Hanevo will act as Principal Contractor to manage the upfront civil works by others.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works will commence on site in early March 2024 and run for 20 weeks.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 23 Feb 2024 11:38:41 GMT</pubDate>
      <guid>https://www.hanevo.com/bridport-blowers</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials-2.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Thingley &amp; Westbury</title>
      <link>https://www.hanevo.com/thingley-westbury</link>
      <description>Works are nearing completion on the ‘Dosing Tanks Replacement’ projects at Westbury and Thingley.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Thingley &amp;amp; Westbury
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works are nearing completion on the ‘Dosing Tanks Replacement’ projects at Westbury and Thingley.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            The works comprised M&amp;amp;E and Civils – namely the disconnection, removal, disposal of existing chemical storage tanks - and the installation and commissioning of 2 x new Ferric Storage Tanks on each site.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The programme was developed to enable the two sites to run concurrently, by utilising reliability periods to fully optimise installation durations. The project is in the final stages, with all tanks now connected, awaiting checmical deliveries to enable reliability testing.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Image: Thingley (left) and Westbury (right).
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/West+Thing.png" alt=""/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 21 Feb 2024 11:57:22 GMT</pubDate>
      <guid>https://www.hanevo.com/thingley-westbury</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/West+Thing.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Swanage UV Progress</title>
      <link>https://www.hanevo.com/swanage-uv-progress</link>
      <description>Works are underway on Phase 2 of the ‘Swanage UV Installation’ project.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Swanage UV Progress
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works are underway on Phase 2 of the ‘Swanage UV Installation’ project. The project involves the installation a duty/standby UV System, Pumps, Mixers and Copa-sacs with accompanying instrumentation and control systems along with a new flooring system over the UV Sump.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Phase 1 involved the installation of 100 Metres of 200mm diameter Stainless Steel pipework in the long void area behind the cliff face.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Phase 2 involves the remaining pipework installation, along with further mechanical and electrical works, which will be completed and commissioned in February 2024. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Prior to contract commencement, the client had envisaged that part of the site would be shut down to facilitate the works. However, this could not be facilitated, and the Hanevo team, working with the client, re-evaluated and amended the methodology in devising a temporary works solution that maintained site operations.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 20 Feb 2024 12:00:16 GMT</pubDate>
      <guid>https://www.hanevo.com/swanage-uv-progress</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Swanage.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hanevo welcomes Andrew Hall to the Hanevo Water Team</title>
      <link>https://www.hanevo.com/hanevo-welcomes-andrew-hall-to-the-hanevo-water-team</link>
      <description>Hanevo's Water Division recently welcomed new starter Andrew Hall to the team.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo welcomes Andrew Hall to the H
          &#xD;
    &lt;/span&gt;&#xD;
    
          anevo Water Team
          &#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo's Water Division recently welcomed new starter Andrew Hall to the team. The Water Division Management team visited Swanage STW recently to undertake a site audit and were delighted to meet with Site Manager Paul Jukes, Electrician Jamie Tate and Electrical new starter Andrew.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This high-profile UV contract is well advanced in Phase 2 of Construction and is programmed to be completed by the end of February 2024. Well done to all on a very successful audit result.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Pictured during the recent Swanage STW Quality Audit (from left to right):
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Senior Electrical Engineer Richard Gray, Project Manager Elizabeth Yates, Electrician Jamie Tate, Andrew Hall, Site Manager Paul Jukes and Contract Manager Simon Longley.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Team.jpg" alt=""/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 19 Feb 2024 12:10:23 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-welcomes-andrew-hall-to-the-hanevo-water-team</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Team.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Vale Road Award</title>
      <link>https://www.hanevo.com/vale-road-award</link>
      <description>Wessex Water have confirmed the award to Hanevo, of the ‘Vale Road – Sludge Screening M&amp;E Works’.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Vale Road Award
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award to Hanevo, of the ‘Vale Road – Sludge Screening M&amp;amp;E Works’.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The project comprises Principal Contractor management of Mechanical, Electrical and Commissioning works, to install a new MCC &amp;amp; Kiosk, Access Staircase, Strainpress Chutes, Break Tank, Various new pumps, pipework, valves and accessories c/w with associated instrumentation.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The driver for this project is to ensure that the S Max is safe by reducing H2S Concentrations. Alternative screening provisions for imported sludge is required to remove any rags from the thickened sludge transferred from Yeovil to Ham thus maximising reactor operational capacity. Works will commence on site in March 2024 and are programmed to complete in July 2024. HANEVO has gained an enviable reputation, with proven delivery on previous and current live projects of this nature such as Swanage UV, Chilton Saltlands Penstocks, Chemical Dosing tank replacements, Frome STW Recirc PS Upgrade, Private Pumping Station Upgrades (90 sites) and numerous EDM installations (400 sites). This work has all been undertaken in recent years under the ongoing EM&amp;amp;I framework.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Simon Longley, HANEVO Contracts Manager for the Wessex region noted:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “We are truly delighted to be awarded this new Contract and are excited to continue our valued working relationship with a new area Wessex Water Management Team. We look forward to the successful delivery of this project”.
           &#xD;
      &lt;br/&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           (Photo below shows the current/existing setup on site and the drawing illustrates the final design)
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Vale+rd+Website.png" alt=""/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 16 Feb 2024 12:19:38 GMT</pubDate>
      <guid>https://www.hanevo.com/vale-road-award</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Social+Media-1b7a1fd5.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>EDM Advanced Contract Award</title>
      <link>https://www.hanevo.com/edm-advanced-contract-award</link>
      <description>Wessex Water have confirmed the award to Hanevo, of two sites under the new EDM Advanced Contracts programme.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           EDM Advanced Contract Award
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award to Hanevo, of two sites under the new EDM Advanced Contracts programme.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           North Nibley STW and Wootton Bassett STW
          &#xD;
    &lt;/span&gt;&#xD;
    
          projects comprises up-front design involvement, including attendance at Hazop and Design Review meetings, to assess buildability. Following this early engagement, Hanevo will act as Principal Contractor to manage the Civil, Mechanical, Electrical and Commissioning works on both sites.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Each site comprises the installation of Pumping Stations to divert the incoming flows to avoid double counting flows at the inlet prior to MCerts flow meter.  Combining the EDMs on Spill to Storm being installed in AMP7, will enable Wessex Water to confirm that the permitted FFT for each WRC is being complied with. Following design selection, the works will be programmed and resourced to commence on site in Summer 2024. HANEVO has previously successfully delivered EDM Monitoring installation works to over 350 sites since 2018, which has led to a trusting and proven working relationship with the client team.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           (Photo below indicates the proposed on-site location for the North Nibley Pumping Station):
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/North+Nibley+Pumping+Station.jpeg" alt=""/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 15 Feb 2024 12:14:44 GMT</pubDate>
      <guid>https://www.hanevo.com/edm-advanced-contract-award</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/North+Nibley+Pumping+Station.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>A Covid Cure for Epsom Hospital</title>
      <link>https://www.hanevo.com/a-covid-cure-for-epsom-hospital</link>
      <description>Epsom Hospital has received an energy efficiency upgrade utilising Rehau’s curtain walling and Total70C windows.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           A Covide Cure for Epsom Hospital
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/epsomhospital02102328244webopt.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            The following news item was published on The Fabricator website available to read
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://www.thefabricator.pro/article/a-covid-cure-for-epsom-hospital" target="_blank"&gt;&#xD;
      
           here.
          &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Article written by Brian Shillibeer
           &#xD;
      &lt;br/&gt;&#xD;
      
           Posted 11th February 2024
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Epsom Hospital has received an energy efficiency upgrade utilising Rehau’s curtain walling and Total70C windows. The install took place in an active emergency department smack in the middle of the covid pandemic.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The NHS, Rehau, Hanevo, JM Aluminium and the LH&amp;amp;E Cost Consultancy all had to work together to ensure there was no disruption to the emergency department and operating theatres.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Epsom Hospital is a healthcare facility like any other, providing services spanning accident and emergency, diagnoses and more to the people of its namesake borough in Surrey. As a critical piece of infrastructure, its continued operation is vital to the health and wellbeing of the local community. However, like any long-serving site, upgrades to the building’s fabric would eventually be necessary in order for it to remain operational.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Major challenge
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “Getting projects across the line in a live hospital environment is a challenge at the best of times, let alone during a global pandemic,” says Dan Kocev, project manager at Epsom and St. Helier University Hospitals NHS Trust. “However, vital energy efficiency upgrades were necessary to bring the site into the 21st century and ensure that it is able to continue providing the best possible environment for care.”
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Natanael Florut, project commissioning manager at the Trust, adds: “We had some old timber screens and windows that simply weren’t up to scratch in terms of energy efficiency. While choosing something like Rehau's curtain walling was quite straightforward, I knew that the matter of the installation would be something else entirely, especially as our database did not have too many technical records from when the hospital was initially built.”
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Critical
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Owing to the complex nature of the project, critical infrastructure specialist Hanevo was brought on board to facilitate the design and build. JM Aluminium was then awarded the contract for the installation based on a list of recommended commercial installers and fabricators provided by Rehau. LH&amp;amp;E Cost Consultancy provided cost consultancy and contract administration services.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Noel Hanley, executive chairman at Hanevo, says: “Working in critical infrastructure means that we’re no stranger to complex projects but we knew that this installation would be difficult even by our own standards. However, through close collaboration with Rehau and the other project partners we were able to come up with a design that we were confident would work.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “Jennifer Marshall at LH&amp;amp;E was amazing in helping the entire project team, by financially reviewing the different design options to ensure the design selected met the client’s budgetary expectations. Annie Thomas then successfully managed the project post-contract as contract administrator and kept on top of all commercial aspects in her role as quantity surveyor.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “Kevin O’Neill at Rehau helped out with the drawings and window specification and ensured that the whole project was compliant with building regulations. The section we were replacing backed onto critical operating theatres and quiet rooms that would remain in use during the installation, so the plan was to complete the removal screen-by-screen. This would also help keep the site protected from the elements as we worked through the winter.”
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Action plan
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           With the stage set for the installation, it fell upon JM Aluminium to put the plan into action. “This was one of the most ambitious projects we’ve ever taken on,” says David Morant, a director at JM Aluminium. “The new curtain walling was to be installed over a live ambulance bay and main pedestrian thoroughfare, meaning comprehensive health and safety assessments were necessary. From here, it was clear that we’d need a specialist system to get the profiles up safely.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “We were able to work closely with London Network Scaffolding to design a bespoke hydraulic and mechanical system, adapting the top of the scaffolding and fitting an electric hoist to raise the panels up through the middle.”
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Windows in time for winter
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Alongside the complex curtain walling installation, the project also saw the installation of 20 Total70 windows in a foil wood grain finish. All in all, the project would take sixteen weeks, beginning in spring 2022 and concluding in the winter.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Kevin O’Neill, a commercial manager at Rehau says: “Collaboration can often be a buzzword across the industry, however I don’t think I’ve worked on a project that epitomises it more than this. The outcome simply wouldn’t have been possible without the hard work and adaptability of our stakeholders, from design through to installation. Minimising disruption was our main priority over the course of the project. The NHS has told us it had few complaints, so we hope to lend our expertise to similar projects in future.”
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 14 Feb 2024 11:17:06 GMT</pubDate>
      <guid>https://www.hanevo.com/a-covid-cure-for-epsom-hospital</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/epsomhospital02102328244webopt.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Chilton Saltlands Penstocks – Project Update</title>
      <link>https://www.hanevo.com/chilton-saltlands-penstocks-project-update</link>
      <description>Hanevo are pleased to report that works have been completed on Phase 1 of the ‘Chilton Saltlands Penstocks Upgrade’ project.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Chilton Saltlands Penstocks – Project Update
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo are pleased to report that works have been completed on Phase 1 of the ‘Chilton Saltlands Penstocks Upgrade’ project. This phase of works comprised Mechanical &amp;amp; Electrical works to repair the Inlet Penstocks and make provision for future actuation. Working in close collaboration with Wessex Water, completion of these works was achieved whilst over-pumping flows of 200l/s back into the rising main to facilitate access into the 26ft deep penstock sumps. Noteworthy is that over-pumping was only permitted during daytime working hours and coupled with the weather conditions, this made for a challenging phase of the project. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The successful completion was helped by careful pre-construction planning and the dedication of the on-site delivery teams. As this site is contained within a built-up housing area, special attention to mitigation measures for noise and security concerns formed a key element within our CDM setup. Phase 2 of the works entails the installation and automation of Rotork Actuators and their subsequent commissioning. These Phase 2 works are scheduled for early January 2024.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Richard Gray, Senior Electrical Project Engineer at Hanevo noted
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “These important Phase 1 works were not without their challenges. The intricacy, depth, location, and over pumping requirements of the works meant that close collaboration with our client was paramount. Safety was the key driver in planning. This attention to detail combined with the skill of the Hanevo installation teams is a source of pride to all involved particularly when the client PM wrote to Hanevo stating “a fantastic amount of work has been completed by Paul and the team on a difficult job”
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 27 Nov 2023 09:33:18 GMT</pubDate>
      <guid>https://www.hanevo.com/chilton-saltlands-penstocks-project-update</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1498462440456-0dba182e775b.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Bridport WWTW Aeration</title>
      <link>https://www.hanevo.com/bridport-wwtw-aeration</link>
      <description>Wessex Water have confirmed the award to Hanevo, of a new project to enhance the efficiency and reliability of the aeration system at Bridport WWTW with the replacement of the existing air blowers.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Bridport WWTW Aeration
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award to Hanevo, of a new project to enhance the efficiency and reliability of the aeration system at Bridport WWTW with the replacement of the existing air blowers. The project includes Mechanical, Electrical and Commissioning works associated with the new blowers and stainless-steel pipework distribution headers and delivery pipework. The blowers will be installed in a duty/standby configuration. Additionally, Hanevo will act as Principal Contractor to manage the civil works being provided by others. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
      
           Key drivers for this project are asset age and process performance. Works will commence on site in March 2024. HANEVO has gained an enviable reputation, with proven delivery on previous and current live projects of this nature. These include notable projects such as Swanage UV, Chilton Saltlands Penstocks, Chemical Dosing tank replacements, Frome STW Recirc PS Upgrade, Private Pumping Station Upgrades (90 sites) and EDM (400 + sites). This work has all been undertaken in recent years under the ongoing EM&amp;amp;I framework.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Elizabeth Yates, HANEVO Project Manager for the Wessex region noted:
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “We are delighted to be awarded this new Contract. We are working closely with Wessex Water Delivery Team on several live projects and look forward to their successful delivery and maintaining our great working relationship”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Sun, 26 Nov 2023 09:22:27 GMT</pubDate>
      <guid>https://www.hanevo.com/bridport-wwtw-aeration</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials-2.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Project Review: Hanevo Primary Contractor for Epsom Hospital Refurbishment</title>
      <link>https://www.hanevo.com/project-epsom-hospital-refurbishment</link>
      <description>Hanevo Contracts Manager, Jozef Mountain details within the video, how Hanevo took a ‘lessons learned’ approach to the screen installation, developed a bespoke scaffolding solution and working closely with JM Aluminium and the London Network Scaffolding.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    
          Project Review: Hanevo Primary Contractor for Epsom Hospital Refurbishment
          &#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/epsom_hospital_021023_28287+copy.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Below is a recently produced video detailing the refurbishment of Epsom Hospital. Hanevo acted as primary contractor on the project and participated in the production of this video.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo Contracts Manager, Jozef Mountain details within the video, how Hanevo took a ‘lessons learned’ approach to the screen installation, developed a bespoke scaffolding solution and worked closely with the project delivery team.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The project entailed the replacement of 4 sections of the curtain wall originally installed at the hospital. This required experience of working in public buildings.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Key consideration was the fact this work was to be conducted in a live hospital environment, primarily at the entrance to the A&amp;amp;E department. In order to develop the construction solutions Hanevo worked closely with ward leads to ensure disruption was kept to an absolute minimum and collaborated with installers, the NHS team, technical and design support throughout.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 01 Nov 2023 16:01:53 GMT</pubDate>
      <guid>https://www.hanevo.com/project-epsom-hospital-refurbishment</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/epsom_hospital_021023_28287+copy.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hanevo Begin Works for ACS Cobham</title>
      <link>https://www.hanevo.com/hanevo-begin-works-for-acs-cobham</link>
      <description>HANEVO have been awarded a full refurbishment, remodel &amp; extension to the West Lodge building on the ACS International School site in Cobham, Surrey.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo begin works for ACS Cobham
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/138.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have been awarded a full refurbishment, remodel &amp;amp; extension to the West Lodge building on the ACS International School site in Cobham, Surrey. With works commenced in July 2023 under a traditional form of contract, we have completed strip-out works &amp;amp; are well progressed with the extension construction &amp;amp; 1
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           st
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      
            fix elements in the main building.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Across two floors of the building, works comprise the full strip-out &amp;amp; repurposing of the building to provide ancillary meeting &amp;amp; administrative space for the school, one of the most sought after educational establishments in the area. The new space will house several glazed meeting rooms, open plan office space &amp;amp; ancillary facilities to ensure staff comfort &amp;amp; convenience. The new single storey extension is built to blend in with the retained building, with significant alterations to the roof to facilitate. Thermal &amp;amp; Acoustic performance are being significantly enhanced in the building to ensure that it not only offers a comfortable &amp;amp; user-friendly space, but also that efficiency is optimised for the future use. Externally, works include new landscaping and the creation of additional parking space for staff using the building.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Commenting on the project, Contracts Director Jozef Mountain stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “HANEVO are delighted to have been awarded the project for such a high-profile client. It enables us to showcase our abilities to deliver in the educational sector to the highest levels of quality and safety. We are working closely with the client to ensure that our construction processes pose zero impact on school operations including, significantly, the safeguarding of the many pupils continuing to receive education on the wider estate. We are hopeful that the success of this project will lead to a long term partnership with ACS Cobham to help deliver further improvements around their estate as part of their master planning”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 25 Aug 2023 15:21:08 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-begin-works-for-acs-cobham</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/138.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hanevo Reach Practical Completion on Vere Dental</title>
      <link>https://www.hanevo.com/hanevo-reach-practical-completion-on-vere-dental</link>
      <description>HANEVO have successfully reached practical completion on the prestigious dental fit out for Vere Dental in Battersea, London.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo reach practical completion on Vere Dental
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo-Dental.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have successfully reached practical completion on the prestigious dental fit out for Vere Dental in Battersea, London. The final product is of an exemplary standard, with the highest quality of finishes achieved in every aspect. The design &amp;amp; build works have included new functional clinical spaces, including x-ray provision, and all ancillary space for staff &amp;amp; the public alike. We have facilitated the installation of specialist dental &amp;amp; clinical equipment, complemented by many high-quality finishes products sourced from across the world, from Italy to the USA.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The practice can now begin to accept patients and provide the highest level of care possible and is future proofed to enable expansion into further clinical space as demand &amp;amp; capacity grows.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Project Manager Mick O’Dea stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “We have taken the project from a shell and core through to one of the most impressive interiors achievable in the private dental sector. Not without its challenges, the project is evidence of a truly collaborative relationship with our supply chain to create the architectural intent in the finished products whilst ensuring clinical functionality. We are delighted to be able to put the HANEVO name to such an impressive fit-out”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 24 Aug 2023 15:18:55 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-reach-practical-completion-on-vere-dental</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo-Dental.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Swanage UV Installation</title>
      <link>https://www.hanevo.com/swanage-uv-installation</link>
      <description>Wessex Water have confirmed the award to Hanevo, of the new ‘Swanage UV Installation’ project.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Swanage UV Installation
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Swanage+UV+1.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award to Hanevo, of the new ‘Swanage UV Installation’ project. Due to it’s seafront location, Swanage STW site is critical to Wessex Waters operations and is one of their most prestigious sites. The project planning includes off site fabrication in the Autumn / Winter of 2023 with the installation works being completed and commissioned in an 8-week shutdown period in early 2024.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The project comprises Mechanical, Electrical and Commissioning works, to install a new duty/standby configured UV System. Pumps, Mixers and Copa-sacs with accompanying instrumentation will be installed. As part of the mechanical works Hanevo will supply and install a new flooring system and over 100 Metres of 200mm diameter Stainless Steel pipework in various areas of site including in a small, long void area behind the cliff face.
           &#xD;
      &lt;br/&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO has gained an enviable reputation, with proven delivery on previous projects of this nature such as Frome STW Recirculation Building Upgrade, Private Pumping Station Upgrades (90 sites) and EDM Operations (220 sites). This work has all been undertaken in recent years under the ongoing EM&amp;amp;I framework.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Elizabeth Yates, HANEVO Project Manager for the Wessex region noted:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “We as a team are delighted to be awarded this prestigious new Contract. It is a great testament to our ability to deliver schemes of this nature. We are working closely with Wessex Water Delivery Team and Operations to ensure programme delivery to meet the regulatory output”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 23 Aug 2023 14:58:34 GMT</pubDate>
      <guid>https://www.hanevo.com/swanage-uv-installation</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Swanage+UV+1.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Wessex Award new Year 4 EDM Contract to Hanevo</title>
      <link>https://www.hanevo.com/wessex-award-new-year-4-edm-contract-to-hanevo</link>
      <description>Wessex Water have confirmed the award to Hanevo, of a new Year 4 Event Duration Monitoring (EDM) Contract commencing with 27 No. Sites, as part of a rolling contract.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex award new Year 4 EDM Contract to Hanevo
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/EDM+2.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award to Hanevo, of a new Year 4 Event Duration Monitoring (EDM) Contract commencing with 27 No. Sites, as part of a rolling contract.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The EDM project comprises Electrical and Commissioning works, to existing and new flow monitoring installations, to ensure all Spills to the Environment are captured and recorded by Wessex Water. The previous Year 3 contract awarded to Hanevo was successfully delivered between January 2022 and July 2023, which comprised of works to 116 sites.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Due to the varied scope of works and the location of some monitoring equipment (i.e under manholes in roads) a number of parties will be engaged to ensure works can be completed. These include Civil Crews, Traffic Management, Specialist Cover Lifting Crews, WW Automation, IS E2E Testing Department who all work together in conjunction with the Hanevo Electrical and Commissioning teams. Hanevo and Wessex Water Project Managers collaborate to plan and deliver a successful rolling programme.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO has gained an enviable reputation in managing multi-site schemes of this nature, with proven delivery on previous projects such as Private Pumping Station Upgrades (90 sites) and EDM Operations (220 sites). This work has all been undertaken in recent years under the ongoing EM&amp;amp;I framework.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Richard Gray, HANEVO Senior Electrical Project Engineer for the Wessex region noted:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “It is a great achievement to be awarded a new contract for the new Year 4 EDM works, This will bring the total number of site installs to 143 which is a great testament to our ability to deliver multi-site schemes of this nature. We are working to a flexible programme, to accommodate the availability of the numerous parties involve. We are delighted to receive the new Contract and we look forward to the successful delivery of these”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 22 Aug 2023 14:48:52 GMT</pubDate>
      <guid>https://www.hanevo.com/wessex-award-new-year-4-edm-contract-to-hanevo</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/EDM+2.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Chilton Saltlands Penstocks</title>
      <link>https://www.hanevo.com/chilton-saltlands-penstocks</link>
      <description>Wessex Water have confirmed the award to Hanevo, of the ‘Chilton Saltlands Penstocks Upgrade’ project. The project comprises Mechanical, Electrical and Commissioning works to repair the actuated Inlet Penstocks.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Chilton Saltlands Penstocks
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Chilton--281-29.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award to Hanevo, of the ‘Chilton Saltlands Penstocks Upgrade’ project. The project comprises Mechanical, Electrical and Commissioning works to repair the actuated Inlet Penstocks.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo will set up an over-pumping arrangement and divert flows of up to 200l/s back into the rising main further upstream to allow the works to take place. The main works involve the cleaning of two large sumps to allow access to refurbish the Penstocks including the installation of new spindles. The site is contained within a built-up housing area and mitigation of noise, on site security and public safety have been paramount in project planning and decision making. Working closely with our specialist supply chain, Hanevo will provide an acoustic pump system and specialist security setup to meet these requirements. HANEVO has extensive experience with this type of project involving specialist temporary works.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Simon Longley, HANEVO Contracts Manager for the Wessex region noted:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “The team are pleased to be awarded this new Contract. We are working with the Wessex Water Delivery Team in the West and are liaising with Operations to ensure critical shutdowns / temporary works fully meet the criteria required”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 21 Aug 2023 14:37:34 GMT</pubDate>
      <guid>https://www.hanevo.com/chilton-saltlands-penstocks</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Chilton--281-29.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>We Are Hiring: Project Manager</title>
      <link>https://www.hanevo.com/we-are-hiring-project-manager</link>
      <description>We are seeking a Project Manager to assist in the delivery of construction and refurbishment projects in London and the South of England. Working predominantly in the healthcare and education sectors, with projects in both new build and live, operational facilities</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           We Are Hiring: Project Manager
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           We are seeking a Project Manager to assist in the delivery of construction and refurbishment projects in London and the South of England. Working predominantly in the healthcare and education sectors, with projects in both new build and live, operational facilities. Site based dependant on project timeframe and location, with key roles including:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Supervision of site works ensuring safe delivery, helping develop CPH&amp;amp;S plan and ensuring RAMS are checked, approved and adhered to
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Overseeing works delivery according to programme and quality requirements
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Project reporting to senior management on progess and other matters
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Co-ordination of on site works with multiple trades
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Stakeholder engagement at a local level to ensure consideration of others during the works
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Material take-offs and calling off to site as required through procurement department
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Assistance in design / value engineering workshops with the design team and senior staff
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Working with the client to scope additional works as projects develop
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The ideal candidate would have the following:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Level 6 or Degree qualified in a relevant construction discipline
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            SMSTS (Training can be provided)
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            1
           &#xD;
      &lt;/span&gt;&#xD;
      &lt;sup&gt;&#xD;
        
            st
           &#xD;
      &lt;/sup&gt;&#xD;
      &lt;span&gt;&#xD;
        
             aid at work (Training can be provided)
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Proficiency in Microsoft suite of documents including MS Project essential.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            3-4 years post-graduate or qualification experience in the construction sector, ideally in healthcare or education environments
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Experience of refurbishment works including MEP installations and building fabric
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Apply to Jim Drain HR Manager at
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="mailto:Jdrain@hanevo.com" target="_blank"&gt;&#xD;
      
           Jdrain@hanevo.com
          &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 22 May 2023 12:13:49 GMT</pubDate>
      <guid>https://www.hanevo.com/we-are-hiring-project-manager</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Option+1.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO to Deliver Private Dental Clinic Development in Bexleyheath</title>
      <link>https://www.hanevo.com/hanevo-to-deliver-private-dental-clinic-development-in-bexleyheath</link>
      <description>HANEVO have been awarded the full design and build of the Sandford Dental Clinic in Bexleyheath.  The project involves the remodelling of the existing facility across four floors, with a large element of the adjacent clinic remaining operational throughout.  Our scope of works includes the design of all building fabric and M&amp;E services, and the installation of the same, with commencement on site in June 2023.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO to Deliver Private Dental Clinic Development in Bexleyheath
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Screenshot+2023-05-19+at+12.57.01.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have been awarded the full design and build of the Sandford Dental Clinic in Bexleyheath. The project involves the remodelling of the existing facility across four floors, with a large element of the adjacent clinic remaining operational throughout. Our scope of works includes the design of all building fabric and M&amp;amp;E services, and the installation of the same, with commencement on site in June 2023.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Works include the remodelling of the Ground Floor, with a new feature glazed &amp;amp; bronze extension as a focal point for the entrance, with external landscaping also upgraded. Internally we will create a new, welcoming reception space for patients, with feature lighting and high-quality bespoke furniture. To facilitate this, significant structural work is required, as well as extensive MEP service alterations. Competing the ground floor will be a new dental surgery and facial aesthetic room, with feature glazed walls. On the upper floors we undertake a full refurbishment, resulting in six remodelled surgeries and numerous ancillary facilities for both staff and patients. Significant works are required in the basement are to facilitate service requirements, with the design optimising all available space.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Commenting on the award, HANEVO Commercial &amp;amp; Procurement Manager Grainne Hanley stated “HANEVO are delighted to have been awarded this exciting scheme adding to a growing portfolio in the private healthcare sector. Design and procurement have already commenced and we will be working closely with our well-established supply chain throughout, building on our collective experience from recent similar schemes in the Healthcare &amp;amp; Dental sectors, to ensure that the Client’s expectations are exceeded”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 22 May 2023 10:41:57 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-to-deliver-private-dental-clinic-development-in-bexleyheath</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Screenshot+2023-05-19+at+12.57.01.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Awarded Complex AHU Replacement for Special Baby Care Unit.</title>
      <link>https://www.hanevo.com/hanevo-awarded-complex-ahu-replacement-for-special-baby-care-unit</link>
      <description>HANEVO have been awarded the full design and build project to replace a large Air Handling Unit providing critical air movements to the Special Baby Care Unit (SCBU) at Epsom Hospital.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Awarded Complex AHU Replacement for Special Baby Care Unit
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            HANEVO have been awarded the full design and build project to replace a large Air Handling Unit providing critical air movements to the Special Baby Care Unit (SCBU) at
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          Epsom Hospital.  With the AHU having reached end of life, it requires replacement to current regulations to ensure full compliance with HTM criteria. The SCBU unit requires a decant during the works, to enabling intrusive duct cleaning and damper works in the department, for which HANEVO are working closely with the stakeholders to ensure suitable decant space is prepared and a seamless transition for these critical services can take place both before and on completion of the works. Design works have been progressed to the point where the AHU has now been ordered by the HANEVO team and extensive stakeholder liaison has taken place to ensure the full requirements of all users are accounted for in both the end product and the installation methodology. 
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Works are complicated by the AHU being located beneath, and structurally supporting another large AHU that feeds the Maternity Unit and is to remain live throughout the works. As such a bespoke steel support structure is being installed to enable removal of the lower AHU for
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          replacement without any need to isolate or shut down the Maternity Unit. As part of the works HANEVO are also ensuring upgraded fire compliance of the retained ductwork installation to meet the Trust’s current Fire Strategy. This includes the addition of fire dampers to the ductwork and extensive associated controls wiring and panel adaptions to ensure functionality.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Commenting on the award, HANEVO Construction Director Jozef Mountain stated
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “HANEVO have in no doubt been awarded this project in part due to the excellent work we have done with the Trust previously, and our proven ability to put the users and stakeholders first in everything we do. We are confident that by continuing our collaborative working practices with the Trust stakeholders we can ensure optimised service delivery for the SCBU unit and will not have any detrimental impact on the exemplary work the department does in caring for such precious life. We are also working closely with specialist partners to ensure optimum performance to HTM requirements and maintaining best value for public funds in the NHS”
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 30 Mar 2023 17:07:41 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-complex-ahu-replacement-for-special-baby-care-unit</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/_101581979_hi011273325.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Awarded Prestigious Private Dental Clinic</title>
      <link>https://www.hanevo.com/hanevo-awarded-prestigious-private-dental-clinic</link>
      <description>HANEVO have been awarded the full design and build of a new Dental Clinic for a private client in London.  The works involve the fit-out of a shell and core facility at the heart of a prestigious new residential development, providing private dental treatment of the highest quality.  Works are being undertaken in a constrained site with close control and co-ordination required with the estates team, surrounding businesses and residents alike for all logistics and delivery methods.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Awarded Prestigious Private Dental Clinic
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Dental.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have been awarded the full design and build of a new Dental Clinic for a private client in London. The works involve the fit-out of a shell and core facility at t
          &#xD;
    &lt;/span&gt;&#xD;
    
          he heart of a prestigious new residential development, providing private dental treatment of the highest quality. Works are being undertaken in a constrained site with close control and co-ordination required with the estates team, surrounding businesses and residents alike for all logistics and delivery methods.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The works involve the design and build installation of all building fabric and MEP services with commencement on site in late March 2023. The facility will house 5 treatment surgeries and ancillary space, with significant features including high-quality building finishes and an array of specialist bespoke furniture to compliment the client’s dental offering. The building will include feature architectural detailing including polished plaster feature walls, recessed feature lighting throughout, specialist surface works, pocket sliding doors, bespoke timber panelling and porcelain-tiled circulation space. Additional activities include radiation protection from X-ray equipment and installation of specialist dental equipment in the surgery spaces.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Commenting on the award, HANEVO Desig
          &#xD;
    &lt;/span&gt;&#xD;
    
          n &amp;amp; Contract’s Manager Jozef Mountain stated
          &#xD;
    &lt;span&gt;&#xD;
      
           “HANEVO are excited to be able to showcase our ability to compliment our Healthcare fit-out expertise with the highest quality finishes for such a prestigious client. We have begun in earnest with the detailed design development and procurement to ensure client expectations are met whilst delivering on a challenging programme of works. We will utilise the full array of HANEVO’s business operations to ensure that this project is an exemplar for the private dental sector”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 16 Mar 2023 10:57:46 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-prestigious-private-dental-clinic</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Dental.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Wessex Award New Group of 27 No. EDM’s to Hanevo</title>
      <link>https://www.hanevo.com/wessex-award-new-group-of-27-no-edms-to-hanevo</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Award New Group of 27 No. EDM's to HANEVO
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water have confirmed the award to Hanevo, of a further 27 No. Event Duration Monitoring (EDM) Sites as part of a rolling contract.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The EDM project comprises Ele
          &#xD;
    &lt;/span&gt;&#xD;
    
          ctrical and Commissioning works, to existing and new flow monitoring installations, to ensure all Spills to the Environment are captured and recorded by Wessex Water.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This ongoing contract has been running since January 2022 and the new award will increase the number of sites from 86 No. to 116 No. The new additions will increase the programme duration into and beyond April 2023.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Due to the varied scope of works and the location of some monitoring equipment (i.e under manholes in roads) a number of parties must be engaged to ensure works can be completed. These include Traffic Management, Gatic Covers Lifting Crews, WW Automation, IS E2E Testing Department who all work together in conjunction with Hanevo Electrical and Commissioning teams.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           To ensure the rolling programme is resourced and planned in the most logistically efficient way, Hanevo and Wessex Water Project Managers collaborate in the up-front planning process.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO has gained an enviable reputation in managing multi-site schemes of this nature, with proven delivery on previous projects such as Private Pumping Station Upgrades (90 sites) and EDM Operations (220 sites). This work is all undertaken in recent years under the ongoing EM&amp;amp;I framework.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Paul Jukes
          &#xD;
    &lt;/span&gt;&#xD;
    
          , HANEVO Electrical Engineer for the Wessex region noted:
          &#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “It is a great accomplishment to have retained this contract for over a year now, and to surpass the 100 site milestone is a great testament to our ability to deliver schemes of this nature.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            We are working to a complex programme, with a number of parties involved, but this has not hindered successful delivery to date. We are delighted to receive the award of additional sites and we look forward to the successful delivery of these”.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 13 Mar 2023 11:59:45 GMT</pubDate>
      <guid>https://www.hanevo.com/wessex-award-new-group-of-27-no-edms-to-hanevo</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Social+Media.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Chemical Storage Win for HANEVO</title>
      <link>https://www.hanevo.com/chemical-storage-win-for-hanevo</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Chemical Storage Win for HANEVO
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo has been awarded the project to install new Ferric Storage Tanks at the Westbury and Thingley STW’s. The works at both sites involve Civil &amp;amp; M&amp;amp;E requirements and includes the disconnection, removal &amp;amp; disposal of the existing chemical storage tanks in conjunction with the transportation, installation, and commissioning of 2 x new Ferric Storage Tanks. The programme has been developed to enable the two sites to run concurrently, by utilising reliability periods to fully optimise install durations. The project is now in design and procurement stage, with site enabling works due to commence later this month. The overall project is expected to run for 10 weeks.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Simon Longley,
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            HANEVO Contracts Manager for the Wessex region, noted pre commencement planning is underway.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           “Following the successful delivery of the recent ‘Frome STW Recirculation PS upgrade’ project, and our ongoing delivery of the Event Duration Monitoring contract, We have proven our understanding of Wessex Water’s requirements. We are delighted with this contract award, and we look forward to successful delivery with all the stakeholders”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           END
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 10 Mar 2023 16:45:33 GMT</pubDate>
      <guid>https://www.hanevo.com/chemical-storage-win-for-hanevo</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials-2-36e517ea.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Opportunity: Industrial Electrician / Supervisor</title>
      <link>https://www.hanevo.com/opportunity-industrial-electrician-supervisor</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Opportunity: Industrial Electrician / Supervisor
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           **UPDATE** this position has now been filled.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    
          Hanevo is pleased to announce that due to continued growth within the business, we are looking to recruit a full time Industrial Electrician / Supervisor to join the Water Projects Delivery Team in the Wessex area. This is an exciting opportunity to join an established business and be part of a proven dedicated team delivering schemes for bluechip clients.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Please refer to the Job Opportunities page on the Hanevo website for further information by
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/vacancies"&gt;&#xD;
      
           clicking here
          &#xD;
    &lt;/a&gt;&#xD;
    &lt;a href="/vacancies"&gt;&#xD;
      
           .
          &#xD;
    &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 18 Jan 2023 23:11:08 GMT</pubDate>
      <guid>https://www.hanevo.com/opportunity-industrial-electrician-supervisor</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Job.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Christmas 2022 “Thank You”</title>
      <link>https://www.hanevo.com/christmas-2022-thank-you</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Christmas 2022 “Thank You” 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           To our Clients, stakeholders, staff, suppliers, friends, and families, for Christmas 2022 we wish to say, “Thank You”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           2022 has been a successful year for Hanevo and our partners with many accomplishments. These range from successful project deliveries, project awards and professional certifications to the appointment of new staff and the development of new and existing business relationships.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           It is rewarding that this success followed from safety, wellbeing and mental health being at the centre of our decision making.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           We wish you all a happy and peaceful Christmas and New Year.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 22 Dec 2022 15:23:29 GMT</pubDate>
      <guid>https://www.hanevo.com/christmas-2022-thank-you</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Christmas+2022.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Wessex Water EM&amp;I Framework Extension</title>
      <link>https://www.hanevo.com/wessex-water-em-i-framework-extension</link>
      <description>Having been previously awarded a place on the Wessex Water Amp 7 EM&amp;I and maintenance framework, Hanevo is delighted to confirm the extension of this framework by 2 years to the end of 2024.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water EM&amp;amp;I Framework Extensio
          &#xD;
    &lt;/span&gt;&#xD;
    
          n
         &#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Having been previously awarded a place on the Wessex Water Amp 7 EM&amp;amp;I and maintenance framework, Hanevo is delighted to confirm the extension of this framework by 2 year
          &#xD;
    &lt;/span&gt;&#xD;
    
          s to the end of 2024.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo Contracts Manager, Simon Longley believes the extension is confirmation of the reliable partner Hanevo has become on Amp 7 while delivering numerous projects for Wessex Water. “We have benefited from the Head Office decision to keep all our staff through the recent and very difficult Covid period. This has maintained the consistency and reliability of our delivery and allowed us to deeper develop trust with both our suppliers and clients. Work on our EDM and Flow Meter programmes has continued in conjunction with this framework and we are absolutely delighted by this news”. Simon should know about consistency and reliability as he has recently reached 48 years working in the Water Industry. A fantastic milestone.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 21 Nov 2022 22:36:02 GMT</pubDate>
      <guid>https://www.hanevo.com/wessex-water-em-i-framework-extension</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1498462440456-0dba182e775b.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>St Helier Hospital Link Tunnel</title>
      <link>https://www.hanevo.com/st-helier-hospital-link-tunnel</link>
      <description>Hanevo has been awarded the contract to renovate and repair the Link Tunnel at St Heliers Hospital.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           St Helier Hospital Link Tunnel
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo has been awarded the contract to renovate and repair the Link Tunnel at St Heliers Hospital.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The work will be carried out in a live working environment. Hanevo P
          &#xD;
    &lt;/span&gt;&#xD;
    
          roject Co-ordinator James Andresen explained the work will involve repairs to seal the basement walls and floors to protect against water ingress. The Link Tunnel will be kept in operation for satff and patient use throughout the works.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           RAMS for the project have already been issued with pre-commencent planning well underway. James noted that the work is due to start on site shortly and is expected to take 6 weeks.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 21 Nov 2022 22:32:16 GMT</pubDate>
      <guid>https://www.hanevo.com/st-helier-hospital-link-tunnel</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/St+Helier.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Frome Success</title>
      <link>https://www.hanevo.com/frome-success</link>
      <description>Hanevo has reached completion stage of the ‘Frome STW Recirculation Building Upgrade’ contract for Wessex Water.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           FROME SUCCESS
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo has reached completion stage of the ‘Frome STW Recirculation Building Upgrade’ contract for Wessex Water.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Wessex Water handed over control of the Recirculation building to Hanevo in May 2022, under which a full CDM site setup was established.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The project involved all civil, mechanical, electrical &amp;amp; ICA works, which included the removal of existing shaft driven pumps, pipework, control panel and installation of new, whilst keeping the site operational. New instrumentation was installed to facilitate control of the pumps and new flooring to aid removal of the new pumps. As part of the project, the existing Mains Cable to the building required replacement. This involved the installation of 9 new cable pits and cabling along a 220M route up to the Inlet MCC Building.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The main project objective was to increase recirculation pump efficiency and flow rates. The anticipated improvements have been surpassed with the installation of the new pumps, lending itself to positive commentary from Wessex Operations and Process Staff. Wessex Water Project Manager for the scheme, while thanking Hanevo noted, “The project has been delivered both on time and within our budget constraints”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Frome.jpg" alt=""/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 19 Jul 2022 23:28:17 GMT</pubDate>
      <guid>https://www.hanevo.com/frome-success</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Frome.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Complete Cath Lab Enabling Project for Epsom Hospital</title>
      <link>https://www.hanevo.com/hanevo-complete-cath-lab-enabling-project-for-epsom-hospital</link>
      <description>HANEVO have reached practical completion on the Cath Lab enabling project, enabling Epsom &amp; St Helier University Hospitals NHS Trust to provide critical services to their patients in line with their care provision commitments.  With the Cath Lab unit only delivered in mid-May, HANEVO have completed a full new build of the link corridor and ancillary store building in just over 4 weeks, an extremely quick programme with all works from foundations up being completed in this timeframe, including all building fabric, M&amp;E works and Medical Gas installations.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Complete Cath Lab Enabling Project for Epsom Hospital
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have reached practical completion on the Cath Lab enabling project, enabling Epsom &amp;amp; St Helier University Hospitals NHS Trust to provide critical services to thei
          &#xD;
    &lt;/span&gt;&#xD;
    
          r patients in line with their care provision commitments. With the Cath Lab unit only delivered in mid-May, HANEVO have completed a full new build of the link corridor and ancillary store building in just over 4 weeks, an extremely quick programme with all works from foundations up being completed in this timeframe, including all building fabric, M&amp;amp;E works and Medical Gas installations.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Michael O’Dea, HANEVO Operations Manager commented “We would like to place on record our thanks to the full supply chain in helping HANEVO to achieve completion in an extremely challenging timeframe. A monumental effort was put in by all HANEVO’s supply chain partners and we are delighted that the scheme has been handed over to the highest standard of finish to a very satisfied client”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           END.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 21 Jun 2022 21:57:04 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-complete-cath-lab-enabling-project-for-epsom-hospital</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Epsom+Cath+Lab.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Awarded Curtain Walling Project at Epsom Hospital</title>
      <link>https://www.hanevo.com/hanevo-awarded-curtain-walling-project-at-epsom-hospital</link>
      <description>HANEVO have been appointed to undertake the replacement of 4 large curtain walling sections to the Denbies Wing of Epsom Hospital.  Building on an excellent collaborative relationship with Epsom &amp; St Helier University Hospitals NHS Trust, HANEVO will be undertaking these complex works in a critical area of the hospital, working around and above the busy A&amp;E department and heavily trafficked public areas.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Awarded Curtain Walling Project at Epsom Hospital
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have been appointed to undertake the replacement of 4 large curtain walling sections to the Denbies Wing of Epsom Hospital. Building on an excellent collaborative
          &#xD;
    &lt;/span&gt;&#xD;
    
          relationship with Epsom &amp;amp; St Helier University Hospitals NHS Trust, HANEVO will be undertaking these complex works in a critical area of the hospital, working around and above the busy A&amp;amp;E department and heavily trafficked public areas. 
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Jozef Mountain, HANEVO Contracts Manager stated “HANEVO look forward to working on this challenging scheme in collaboration with our client and the many stakeholders involved. Significant temporary works will be required to mitigate any impact on ongoing Hospital operations, and HANEVO are working in tandem with our supply chain specialists to deliver an exemplary scheme. HANEVO have begun in earnest with curtain wall materials already ordered and detailed design well underway”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           END.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 21 Jun 2022 21:55:00 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-curtain-walling-project-at-epsom-hospital</guid>
      <g-custom:tags type="string">Critical Infrastructure</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Epsom-Hospital-entrance-e1601570618301.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Awarded EDM Sites on Year 3 Programme at Wessex</title>
      <link>https://www.hanevo.com/hanevo-awarded-edm-sites-on-year-3-programme-at-wessex</link>
      <description>Following the successful delivery of numerous EDM site installations for Wessex Water, Hanevo have been awarded an additional 15 sites on the EDM Mon 1 Contract, the first of the year 3 programme.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Awarded EDM Sites on Year 3 Programme at Wessex
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Following the successful delivery of numerous EDM site installations for Wessex Water, Hanevo have been awarded an additional 15 sites on the EDM Mon 1 Contract, the fir
          &#xD;
    &lt;/span&gt;&#xD;
    
          st of the year 3 programme.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The works will form part of the ongoing schedule to upgrade spill monitoring and performance at selected sites. The works will be carried out to Wessex Water standards, specifications and WIMES. The installations require Hanevo to develop the RAMS and PRAs and liaise with the Wessex Water IS Dept to co-ordinate “End to End” testing.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Elizabeth Yates, of Hanevo noted the scoping work is complete and on-site activity will commence shortly.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           END.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 21 Jun 2022 21:43:32 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-edm-sites-on-year-3-programme-at-wessex</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/md/pexels/dms3rep/multi/pexels-photo-612341.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Awarded Cath Lab Project at Epsom Hospital</title>
      <link>https://www.hanevo.com/hanevo-awarded-cath-lab-project-at-epsom-hospital</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            HANEVO Awarded Cath Lab Project at Epsom Hospital
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Epsom+Hospital.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO have been awarded the Cath Lab enabling project at Epsom Hospital, on behalf of Epsom &amp;amp; St Helier University Hospitals NHS Trust. Commencing on site in late March
          &#xD;
    &lt;/span&gt;&#xD;
    
          2022, HANEVO will be designing and constructing a new link building to tie existing facilities to a new specialist modular Relocatable Cardiac Catheterization Lab (Cath Lab) unit. As part of the Trust’s plans to ensure the patient care backlog caused by COVID can be significantly reduced, and the need to expand the scope of services and procedures currently delivered to their patients, The Trust have put a ‘high priority’ tag on this project and require a fast tracked and collaborative approach. 
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           With an extremely challenging programme of 8 weeks, HANEVO will be undertaking all design works, groundwork, external walls and facades, roofing and full internal fit out of the link building. Mechanical, Electrical, Medical Gas and other specialist services will be included in the works, adopting a close relationship with incumbent Trust specialists. The new build will also involve the refurbishment of consultant offices and will be carefully phased to maintain full public and staff access into the existing building throughout. HANEVO will be working in a fully collaborative manner with the Cath Lab provider and service delivery leads to ensure that the design and construction is fully co-ordinated with their elements of construction works and functionality in operation. 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 23 Mar 2022 10:25:51 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-cath-lab-project-at-epsom-hospital</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Epsom+Hospital.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Progress Works at St Helier G Block Contract</title>
      <link>https://www.hanevo.com/hanevo-progress-works-at-st-helier-g-block-contract</link>
      <description>HANEVO Progress Works at St Helier G Block Contract</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO Progress Works at St Helier G Block Contract
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/St+Helier.png.jpeg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO are well progressed on our G Block refurbishment works for Epsom &amp;amp; St Helier University Hospitals NHS Trust. Completing in the coming weeks, HANEVO have been undertaking full refurbishment of 2 floors of the building to provide new clinical and administrative space for Renal Services provided by the Trust at the main St Helier Hospital in Carshalton. HANEVO have undertaken strip-out and demolition, mechanical and electrical installation, hygienic cladding, flooring, decoration, and specialist fit-out or a v
           &#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
      
           ariety of spaces to necessary HTM regulations. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Commenced in January 2022 following a short enabling contract, HANEVO have undertaken all works at a fast pace to a demanding programme, whilst working around live Hospital premises and accommodating the needs of patients, staff and visitors throughout. HANEVO have worked tirelessly with our committed supply chain to ensure specialist equipment is delivered in line with the required programme and to ensure that the works are installed to the highest levels of quality for both the client and clinical end users.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 23 Mar 2022 10:22:47 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-progress-works-at-st-helier-g-block-contract</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/St+Helier.png.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Complete Frome PS Pre-construction</title>
      <link>https://www.hanevo.com/hanevo-frome-pre-construction</link>
      <description>HANEVO complete Frome PS pre-construction.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           HANEVO complete Frome PS pre-construction
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo have completed their pre-construction design and planning for the Frome WPS contract for Wessex Water and are due to commence on site at the end of March 2022. This CDM project involves all civil, mechanical, electrical and ICA works and includes the removal of old pumps, pipework, control panel and installation of new whilst keeping the site running. The system control philosophy was developed in consultation with the control panel supplier and the client.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Part of the original client scope was to provide a generator to facilitate changeover from the old to the new control panel. Hanevo were able to design an alternative solution which negated the need for the generator, thus benefiting the project’s environmental footprint. As this Contract falls under CDM requirements, Hanevo used it’s internal ISO systems to provide the required documentation on which the client commented; “it is nice to see Hanevo have a good system”.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo.jpg"/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Sun, 20 Mar 2022 22:10:01 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-frome-pre-construction</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>ACHILLES UVDB Audit 100% score for HANEVO</title>
      <link>https://www.hanevo.com/achilles-uvdb-audit-100-score-for-hanevo</link>
      <description>HANEVEO is delighted to confirm a 100% score in our year end ACHILLES UVDB audit.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ACHILLES UVDB Audit 100% score for
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          HANEVO
         &#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            HANEVEO is delighted to confirm a 100% score in our year end ACHILLES UVDB audit. In confirming the result to staff, Liam McCarthy noted, it was confirmation of the
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          diligent 
          &#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          manner, in which, Hanevo and their supply chain continues to deliver on behalf of clients.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Formed in 2012 Hanevo has grown into a Contractor of choice for the Critical Environment
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          and Water sectors with countless projects delivered safely and successfully
          &#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            i
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          n difficult and “live working” environments.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           With a well populated pipeline and order book in place for the coming year,
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          Hanevo looks forward to building on the collaborative delivery model with
          &#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    
          clients and suppliers, that has become the cornerstone of its success.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 23 Dec 2021 16:29:51 GMT</pubDate>
      <guid>https://www.hanevo.com/achilles-uvdb-audit-100-score-for-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/66_1_1280x891.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Frome STW contract award for Hanevo</title>
      <link>https://www.hanevo.com/frome-stw-contract-award-for-hanevo</link>
      <description>Hanevo has been awarded a contract by Wessex Water at Frome STW for the complete upgrade of the site Recirculation Pumping Station.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Frome STW contract award for Hanevo
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo has been awarded a contract by Wessex Water at Frome STW for the complete upgrade of the site Recirculation Pumping Station including all required civil, mechanical, electrical and ICA works.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           This contract requires the design and replacement of pipework, pumps, security works, MCC, telemetry. and includes for development of software controls in-conjunction with client’s third parties.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 22 Dec 2021 15:34:52 GMT</pubDate>
      <guid>https://www.hanevo.com/frome-stw-contract-award-for-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/photo-1498462440456-0dba182e775b-5baee309.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Christmas 2021</title>
      <link>https://www.hanevo.com/christmas-2021</link>
      <description>Hanevo would like to take to opportunity to wish all our clients, suppliers, staff and partners a happy and peaceful Christmas.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Christmas 2021
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hanevo would like to take to opportunity to wish all our clients, suppliers, staff and partners a happy and peaceful Christmas.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           We reflect with pride on our achievements
          &#xD;
    &lt;/span&gt;&#xD;
    
          and look forward in anticipation and excitement to 2022.
         &#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Thank you to all who have contributed in any way to the success of Hanevo.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
            
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Each year our staff select the charities to which we contribute at Christmas. We do this to try in our own small way
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           to help those in less fortunate circumstances. Christmas is a time for less thought about profit and more thought about
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           people. Keep safe and may the coming year edge you closer to your dreams.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Christmas-b2b78598.png" length="1301441" type="image/png" />
      <pubDate>Wed, 22 Dec 2021 12:19:02 GMT</pubDate>
      <guid>https://www.hanevo.com/christmas-2021</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Christmas-b2b78598.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Christmas-b2b78598.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>EM&amp;I and M&amp;E Framework Awards for HANEVO</title>
      <link>https://www.hanevo.com/em-i-and-m-e-framework-awards-for-hanevo</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         EM&amp;amp;I and M&amp;amp;E Framework Awards for HANEVO
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO has been awarded a place on the Wessex Water
         &#xD;
  &lt;b&gt;&#xD;
    
          M&amp;amp;E Support Framework
         &#xD;
  &lt;/b&gt;&#xD;
  
         being successful on all 3 lots of Mechanical, Electrical and Combined Mechanical &amp;amp; Electrical.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          This award comes after HANEVO have previously been awarded a place on the
          &#xD;
    &lt;b&gt;&#xD;
      
           Amp 7 EM&amp;amp;I framework.
          &#xD;
    &lt;/b&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;b&gt;&#xD;
      
           Grainne Hanley
          &#xD;
    &lt;/b&gt;&#xD;
    
          , Procurement &amp;amp; Commercial at HANEVO, noted the multiple awards allow the company to plan for the longer term and focus on delivery and future growth. She added that HANEVO will continue to work with local supply chain partners to support their own directly employed workforce. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          “We look forward to growing levels of activity due to these awards. We have continued to add resource to the region and will continue to do so throughout Amp 7. We anticipate a busy 2022 and are grateful to our staff and supply chain for their part in this success”.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials-2.png" length="392946" type="image/png" />
      <pubDate>Thu, 30 Sep 2021 21:58:19 GMT</pubDate>
      <guid>https://www.hanevo.com/em-i-and-m-e-framework-awards-for-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials-2.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials-2.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Chippenham &amp; Hinton Road PS’s</title>
      <link>https://www.hanevo.com/chippenham-hinton-road-pss</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Chippenham &amp;amp; Hinton Road PS’s
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO has recently completed SPS upgrades at Chippenham &amp;amp; Hinton Road.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The works which included the installation of new control panels, kiosks and associated controls were delivered on time and within budget. Minor civil works, ducting and over-pumping formed part of the project. These projects are added to a growing portfolio of successful pump station contracts delivered by HANEVO.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Elizabeth Yates of HANEVO noted that additional Pump Stations are currently underway, and the delivery teams involved have created an enviable track record on delivery with client requirements being at the forefront of every success.
          &#xD;
    &lt;i&gt;&#xD;
      
           “We work to fully understand what our client outcome requirements are before we commence planning, and this means we get it right first time. In addition, a lot of these pump stations are located, in areas of public use, where safety and minimal intrusion form the leading edge of our planning and decision making”.
          &#xD;
    &lt;/i&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 16 Sep 2021 10:59:09 GMT</pubDate>
      <guid>https://www.hanevo.com/chippenham-hinton-road-pss</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hinton.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Wessex Flow Metering Award for HANEVO</title>
      <link>https://www.hanevo.com/wessex-flow-metering-award-for-hanevo</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Wessex Flow Metering Award for HANEVO.
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Wessex Water have confirmed the award of their Closed Pipe Flow Metering Modification Works to HANEVO.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The multi-year works programme is expected to be undertaken on over 90 sites with project scoping to commence shortly. HANEVO recently completed Even Duration Monitoring works for Wessex water and the project team are now looking forward to engaging on this new project.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Elizabeth Yates, HANEVO Lead project manager for the Wessex region noted the project delivery team members have already been selected and pre commencement planning is underway.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;i&gt;&#xD;
      
           “We work hard to integrate and inform our supply chain on all aspects of our projects in an open and collaborative way. This has proven to be a successful formula in delivering to our client expectations and we are delighted that the entire team has been rewarded with this contract award. HANEVO have been amazing in supporting our region, particularly
          &#xD;
    &lt;/i&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;i&gt;&#xD;
      
           throughout the covid uncertainty, and this award is a fitting result for that support”.
          &#xD;
    &lt;/i&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials-2.png" length="392946" type="image/png" />
      <pubDate>Thu, 16 Sep 2021 10:56:12 GMT</pubDate>
      <guid>https://www.hanevo.com/wessex-flow-metering-award-for-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials-2.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials-2.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Prestigious NHS contract award for HANEVO</title>
      <link>https://www.hanevo.com/prestigious-nhs-contract-award-for-hanevo</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Prestigious NHS contract award for HANEVO
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO has been award a major project to upgrade the Tynemouth Road Health centre.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The works include M&amp;amp;E services, backlog maintenance, fire compartmentation works and alteration of existing rooms, including the removal of fixtures and fittings. Wall decoration, floor coverings and ceilings, installation of IPS units and the remodelling of the reception areas at ground and 1st floor levels are also included.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The project will complete with the installation of an external platform lift and associated external works including alterations to the existing pedestrian entrance. This project, which starts immediately, is an essential addition to children’s services provision, and will take 6 months to complete. The works programme will be phased as the centre will be in use throughout the project.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Joe Mountain, contracts manager for HANEVO, noted
          &#xD;
    &lt;i&gt;&#xD;
      
           “This project is a reward for the hard work undertaken by HANEVO and our supply chain in understanding our client requirements. We have worked to develop a track record of delivering in critical and live working environments in a safe and efficient manner. We look forward to successful planning and delivery on this project with all stakeholders”.
          &#xD;
    &lt;/i&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Thu, 16 Sep 2021 10:51:46 GMT</pubDate>
      <guid>https://www.hanevo.com/prestigious-nhs-contract-award-for-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Testimonials.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hanevo Awarded Pump Stations Upgrade Contract</title>
      <link>https://www.hanevo.com/hanevo-awarded-pump-stations-upgrade-contract</link>
      <description>Hanevo have been awarded an additional 3 x pump station upgrades by Wessex Water. The works located at Chippenham, Bratton and Purton will commence on site shortly.</description>
      <content:encoded>&lt;h3&gt;&#xD;
  
         Hanevo Awarded Pump Stations Upgrade Contract 
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Hanevo have been awarded an additional 3 x pump station upgrades by Wessex Water. The works located at Chippenham, Bratton and Purton will commence on site shortly. 
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Typical scope of works at each site includes the installation of new kiosks and panels, new ultrasonic controllers, telemetry, building services, earth bonding and NICEIC testing and commissioning.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Richard Gray noted that this project award is a result of the consistent delivery of the team operating in the Wessex Region and the measured approach adopted when scoping solutions. “We take time at the early engagement phase of these projects to fully understand our client’s project objectives. Once we have a clear understanding of these, then and only then will we scope a solution so that each time our client’s expectations are matched or exceeded”.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Work is expected to complete in August 2021.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/photo-1498462440456-0dba182e775b-5baee309-0d78ea26.jpg" length="3028371" type="image/png" />
      <pubDate>Wed, 21 Jul 2021 09:16:51 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-pump-stations-upgrade-contract</guid>
      <g-custom:tags type="string">Water</g-custom:tags>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1498462440456-0dba182e775b.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/photo-1498462440456-0dba182e775b-5baee309-0d78ea26.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Civil Contract Award for Hanevo</title>
      <link>https://www.hanevo.com/civil-contract-award-for-hanevo</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Civil Contract Award for Hanevo
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Having recently been appointed Chief Operation Officer for Hanevo, Dave Shaw was delighted to confirm a new contract award for Hanevo’s Civil division in a Tier 1 contractor capacity.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Dave noted “As a result of the growing relationship with our client, we are in discussions on several other projects in addition to this prestigious one”.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          This London based scheme for an International Property Development Firm will commence in July and take 13 weeks to completion. Hanevo were selected at the end of a thorough tendering process with experience of the project personnel and minimum disruption to the public being among the key requirements for the Client.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The JCT contract will be completed in line with statutory duties, requiring local Council 278 Quality management procedures with the Environmental Health &amp;amp; Safety procedures in line with CDM2015. The works involve interaction with the Council and Highway authorities on behalf of the client. Bulk excavation, road surfacing, block paving, kerbing, bicycle lanes and white lining form the main components of the project. Hanevo will supply all plant, labour and materials.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/md/unsplash/dms3rep/multi/photo-1534374950034-3644ddb72710.jpg" length="338420" type="image/jpeg" />
      <pubDate>Mon, 12 Jul 2021 13:36:46 GMT</pubDate>
      <guid>https://www.hanevo.com/civil-contract-award-for-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/md/unsplash/dms3rep/multi/photo-1534374950034-3644ddb72710.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/md/unsplash/dms3rep/multi/photo-1534374950034-3644ddb72710.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hallen Caravan Park PS</title>
      <link>https://www.hanevo.com/hallen-caravan-park</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Hallen Caravan Park PS
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO has recently completed upgrade works to Hallen Caravan Park Pump Station. With an increasing portfolio of such projects, HANEVO continues to demonstrate their understanding of client requirements while positively engaging with residents and other stakeholders impacted by such works. Hallen PS included asset strip out and removal and the supply and installation of new equipment. A new control kiosk, control panel, earthing, power &amp;amp; instrumentation wiring, lifting davit and safety plant were among the key items installed. Civil works included the installation of a new valve chamber, provision of new concrete sump cover slab c/w access and inspection cover.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Elizabeth Yates of HANEVO thanked the supply chain. “We are receiving new orders and commendations for this type of work on an ongoing basis. We work extremely hard to really understand what all stakeholders need to achieve from such projects. Peace of mind for our client is related to how our work positively impacts those living and working adjacent the works area. We want to thank our supply chain who buy into our belief that our client needs and their customer care objectives are critical elements of project planning”.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;a&gt;&#xD;
    &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/HANEVO+Update.png" alt=""/&gt;&#xD;
  &lt;/a&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 26 May 2021 07:57:24 GMT</pubDate>
      <guid>https://www.hanevo.com/hallen-caravan-park</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo-3e0ed92d.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>SPS completion for HANEVO</title>
      <link>https://www.hanevo.com/sps-completion-for-hanevo</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO has completed another programme of SPS pumping upgrades for Wessex Water on time and within budget.
         &#xD;
  &lt;div&gt;&#xD;
    
          The challenge on such schemes can differ dependent on location, condition and complexity. Steeple Ashton, for example, included the replacement of the existing isolator, removal of existing plant, the provision of a new 3 phase distribution board and associated controls and the installation of new pumps, valves &amp;amp; pipework, control panel and associated wiring.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          A feature of these types of installations is the mix of requirements involved between MEICA and Civil. In this case, in addition to the core MEICA works, civil alterations including pump base construction, valve chamber alterations, ducting and other civil alterations were included.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Richard Gray of HANEVO noted that a key requirement in all cases to achieve the obligatory safety, environmental and quality standards is proper pre-construction planning. “We like to plan once and get it “right first time”. This is an obvious aspiration, but in HANEVO we involve all disciplines from design through to commissioning &amp;amp; handover in real and meaningful collaboration at the very beginning. This ensures the “right first time” aspiration becomes a reality for HANEVO and our clients”.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/photo-1495021125225-d472d864992a-dea1a46a.jpg" alt=""/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Tue, 18 May 2021 08:51:00 GMT</pubDate>
      <guid>https://www.hanevo.com/sps-completion-for-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/IMG-20210514-WA0088.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>EDM Success for HANEVO</title>
      <link>https://www.hanevo.com/edm-success-for-hanevo</link>
      <description>As part of their programme of maintenance, Wessex Water identified a number of assets which required upgrade work to spill monitoring and performance. This work was required to maintain compliance with environmental consents.</description>
      <content:encoded>&lt;h3&gt;&#xD;
  
         EDM Success for HANEVO
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         As part of their programme of maintenance, Wessex Water identified a number of assets which required upgrade work to spill monitoring and performance. This work was required to maintain compliance with environmental consents.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          HANEVO were awarded a programme of site upgrades across a variety of assets from CSOs to SPSs to STW’s, in order to assess monitoring compliance, and identify and deliver solutions to improve performance where required.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Works were delivered in 2 phases. Phase 1 was for initial scoping to ascertain site details and performance. This involved the deployment of a specialist NC2 trained, 3-man confined space entry teams. Phase 2 comprised the installation works themselves. These works were carried out to Wessex Water standards, specifications and WIMES. These installation works required HANEVO to develop the RAMS &amp;amp; PRAs and liaise with the Wessex Water IS Dept to co-ordinate  “End to End” testing. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Having been commended by Wessex Water for the works delivery, Elizabeth Yates thanked the HANEVO supply chain, both internal and external, without whom the ongoing success of HANEVO would not be possible.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Fri, 30 Apr 2021 12:25:23 GMT</pubDate>
      <guid>https://www.hanevo.com/edm-success-for-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/HANEVO+Update+2.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Awarded Simmons House External Security Upgrade</title>
      <link>https://www.hanevo.com/hanevo-awarded-simmons-house-external-security-upgrade</link>
      <description>HANEVO has been awarded the contract to undertake external security upgrade works to Simmons House, London and works have recently commenced on site.</description>
      <content:encoded>&lt;h3&gt;&#xD;
  &lt;span&gt;&#xD;
    
          HANEVO Awarded Simmons House External Security Upgrade
         &#xD;
  &lt;/span&gt;&#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO has been awarded the contract to undertake external security upgrade works to Simmons House, London and works have recently commenced on site. 
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
    &lt;div&gt;&#xD;
      
           Simmons House is a standalone community facility in Archway, North London. The facility provides adolescent mental health care services.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
            
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           The works are required to improve the security of external areas and the contract includes Installation of replacement fencing to the perimeter of the courtyard area as well as inclusion of covers to RWPs.  Working in such a sensitive environment requires significant collaboration and planning with key stakeholders. Work techniques must put patient wellbeing and ongoing care provision to the forefront. This opportunity is a further demonstration of the clients continued trust in HANEVO to deliver in occupied and critical environments. The works will take 3 weeks to complete.
          &#xD;
    &lt;/div&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Wed, 07 Apr 2021 12:22:40 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-simmons-house-external-security-upgrade</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Simmons+House.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO appoints Dave Shaw as Chief Operating Officer</title>
      <link>https://www.hanevo.com/hanevo-appoint-dave-shaw-as-chief-operating-officer</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO appoints Dave Shaw as Chief Operating Officer
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO, the national MEICA, civil engineering and critical environments contract partner, are pleased to announce the appointment of Dave Shaw as their new Chief Operating Officer. Dave brings over 30 years of industry knowledge and experience to the business having previously held the position of Regional Director for Barhale. Dave will work with the board on the strategic development of the company and will be responsible for day to day management of the operational delivery of multi-disciplined activities. Key will be focus on the role the business plays in achieving the best possible outcomes for our clients.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          With a recent AMP7 Water framework award being a first for the company and exciting new opportunities being developed, Dave will build on the sustainable growth strategy HANEVO has followed to date. Sorcha Hanley confirmed: “We are delighted Dave has agreed to join HANEVO. The shareholders have taken time in finding the right person with the right values and knowledge to fit within our business. This is an important board appointment as the role will be key to how we develop within our challenging and exciting industry. With a proven track record in civil engineering, coupled with a strong background in contracting, Dave brings a wealth of industry experience to HANEVO and we wish him every success in his new role.”  Dave Shaw noted: “I am delighted to be joining Hanevo who are a business with a great reputation with their existing clients and who live and deliver by their values”.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Dave%2BShaw.jpeg"/&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png" length="1545" type="image/png" />
      <pubDate>Mon, 29 Mar 2021 18:51:28 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-appoint-dave-shaw-as-chief-operating-officer</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Dave+Shaw.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/5c7acd3f/dms3rep/multi/Hanevo+Background.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Solid 2020 performance at HANEVO</title>
      <link>https://www.hanevo.com/solid-2020-performance-at-hanevo</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  &lt;span&gt;&#xD;
    
          Solid 2020 performance at HANEVO 
         &#xD;
  &lt;/span&gt;&#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Recently filed accounts for HANEVO indicate a solid 2020 trading performance despite the impacts of Covid 19. The 12 months trading period YE 31st December 2020 showed a 16% increase in like for like revenue compared to the previous 12 month reporting period and a 10% uplift on the 2019 nine months filing. Profits held stable at just under 5%. Cash increased by 50% and trade creditors dropped to a record low with rating agencies confirming HANEVO pay creditors faster than industry average. The Board, acknowledging the performance, expressed confidence for 2021 with a recent AMP7 Water framework award being a first for the company and new opportunities being explored in their Water, Critical Environment and Civil divisions. 
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          END.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Blue+Header.png" length="375" type="image/png" />
      <pubDate>Mon, 08 Mar 2021 12:09:19 GMT</pubDate>
      <guid>https://www.hanevo.com/solid-2020-performance-at-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/HANEVO+Update+2.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Blue+Header.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Completes Welfare Improvement Project</title>
      <link>https://www.hanevo.com/welfare-improvement-project</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO Completes Welfare Improvement Project
         &#xD;
  &lt;br/&gt;&#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Recently contracted to undertake welfare improvements at various locations, HANEVO completed all four sites within budget and on programme.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The work was undertaken at Milverton, Portbury Wharf, Longbridge and Tintinhull Ash.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Civils, Mechanical &amp;amp; Electrical improvement works included,
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;ul&gt;&#xD;
      &lt;li&gt;&#xD;
        
            Design of the foundations
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        
            Preparation of ground
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        
            New ducting for electrical cabling
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        
            Concrete foundation slabs or raised plinths (depending on the flood risk)
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        
            Installation of access pathways and/or steps as required.
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        
            Connection of water supplies.
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        
            Connection of waste pipes.
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        
            Installation, fixing and provision of services to Portacabins.
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        
            Testing &amp;amp; Certification.
            &#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
    &lt;/ul&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          HANEVO has again demonstrated the ability to fully understand client requirements and undertake these projects using a consistent approach, where safety, programme, quality and budget are uppermost in collaborative planning and delivery.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;a&gt;&#xD;
    &lt;img src="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Before-e18429c4.png" alt=""/&gt;&#xD;
  &lt;/a&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;a&gt;&#xD;
    &lt;img src="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Before-706d9dea.png" alt=""/&gt;&#xD;
  &lt;/a&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Before.png" length="2088574" type="image/png" />
      <pubDate>Thu, 18 Feb 2021 11:34:12 GMT</pubDate>
      <guid>https://www.hanevo.com/welfare-improvement-project</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/12-5bb22794.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Before.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO ACHIEVES RENEWAL FOR ISO STANDARD ACCREDITATION</title>
      <link>https://www.hanevo.com/hanevo-achieves-renewal-for-iso-standard-accreditation</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO ACHIEVES RENEWAL FOR ISO STANDARD ACCREDITATION
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO is delighted to announce the renewal of our various ISO accreditations after successfully passing our recent audit.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
    &lt;div&gt;&#xD;
      
           HANEVO have been recommended renewal for:
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
            
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           ISO 14001:2015 Environmental Management.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           ISO 90010:2015 Quality Management.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           OHSAS 18001 Occupational Health and Safety Management.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           Achieving this milestone for all three standards is a great testament and reward to the hard work undertaken by the team here at HANEVO.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
            
          &#xD;
    &lt;/div&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Blue+Header.png" length="375" type="image/png" />
      <pubDate>Mon, 08 Feb 2021 23:50:42 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-achieves-renewal-for-iso-standard-accreditation</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/HANEVO+Update+2.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Blue+Header.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Complete Works at Lytchett Matravers Reservoir</title>
      <link>https://www.hanevo.com/hanevo-complete-works-at-lytchett-matravers-reservoir</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO complete works at Lytchett Matravers Reservoir
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Hanevo has completed works at the Lytchett Matravers Reservoir in Dorset.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
    &lt;div&gt;&#xD;
      
           Having recently invested in the requirements needed to operate in drinking water environments, we were delighted to undertake this project. 
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           The contract was delivered on time and on budget. It included the supply and installation of a new metal clad Hager distribution board with associated breakers and enclosures. Power cabling from the new distribution board to ventilation, power, heating, and intruder alarm systems were all provided.  A new supply was also installed for the auto sample taps.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           Grainne Hanley, who oversees commercial &amp;amp; admin at Hanevo noted that while the company has a proven reputation in Wastewater and Critical Environments, it was not active in the Clean Water market until recently. 
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           “We continue to improve our offering to the market. We made the decision to invest in the training, certification and compliance needed to operate in the clean water sector. We are delighted with the opportunities this commitment has created. We look forward to working with our clients on this enhanced offering”.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/pexels-photo-315752.jpeg" length="470159" type="image/jpeg" />
      <pubDate>Sat, 31 Oct 2020 01:51:07 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-complete-works-at-lytchett-matravers-reservoir</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/pexels-photo-315752.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/pexels-photo-315752.jpeg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Successful Project Concludes at Radstock</title>
      <link>https://www.hanevo.com/successful-project-concludes-at-radstock</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Successful Project Concludes at Radstock
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO has recently concluded works on the Radstock Road Sewage Treatment Works in Midsomer Norton. This is yet another successful project completed at a key SWT site in the South of England.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The scope of the project included installation of:
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          •	Pipework, valves and fittings
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          •	Pump controls
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          •	New kiosk
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          •	New Control Panel
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          •	Civil works including site clearance, ducting, bases, valve chamber c/w cover and perimeter fencing.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          •	Completion of NICEIC testing and provision of certification and O&amp;amp;M’s.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Richard Gray of Hanevo noted, "This was a great project to work on with varied skills required. We're delighted to report the client was wholly satisfied with HANVEO and we look forward to many more projects such as this."
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div&gt;&#xD;
  &lt;a&gt;&#xD;
    &lt;img src="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Radstock.png" alt=""/&gt;&#xD;
  &lt;/a&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Radstock.png" length="2453014" type="image/png" />
      <pubDate>Thu, 29 Oct 2020 16:44:58 GMT</pubDate>
      <guid>https://www.hanevo.com/successful-project-concludes-at-radstock</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/IMG-20201008-WA0005-91794add.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Radstock.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Work Concludes at Telford Depot</title>
      <link>https://www.hanevo.com/work-concludes-at-telford-depot</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Work Concludes at Telford Depot
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;div&gt;&#xD;
    
          HANEVO is delighted to announce the completion of our Telford Depot project.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Finishing in early August, this work was undertaken on behalf of Wessex Water and included:
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  
         Mezzanine Level Office / Corridor
         &#xD;
  &lt;div&gt;&#xD;
    
          M&amp;amp;E Office on First Floor &amp;amp; Storage Barn Area
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Toilet Area
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;span&gt;&#xD;
      
           CE's - Fire Alarm System Install       
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Telford+3.png" length="93675" type="image/png" />
      <pubDate>Tue, 18 Aug 2020 10:38:53 GMT</pubDate>
      <guid>https://www.hanevo.com/work-concludes-at-telford-depot</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Telford+3.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Telford+3.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Neonatal Intensive Care Unit (NICU) Upgrade Complete</title>
      <link>https://www.hanevo.com/neonatal-intensive-care-unit-nicu-upgrade-complete</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Neonatal Intensive Care Unit (NICU) Upgrade Complete
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO was recently selected to upgrade the Neonatal Intensive Care Unit (NICU) at The Whittington Health NHS trust in London.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Key to a successful outcome would be overcoming the difficult time constraints involved. With a strict 10 day window to undertake all of the works whilst the ward was decanted, it was essential  that we completed on time and to the exacting quality standards required to enable the critical care to recommence in the ward on 5th August.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The works were undertaken using day and night shifts over the 10 days period and included both building fabric and M&amp;amp;E upgrade works.  Flooring to all clinical spaces were replaced with new hygienic vinyl and all walls and ceilings made good and redecorated.  The existing suspended ceilings were refurbished with replacement tiles and extensive cleaning.  Existing clinical wash hand basins were replaced with proprietary HTM compliant IPS units and extensive new hot water service pipework was run for future connection of to serve all outlets in the ward.  Additional minor works were undertaken in offices to improve privacy and working spaces. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          We also took the opportunity whilst the ward was vacant to complete other works from our main Fire Remediation contract, to avoid any future disruption to service provision.  This involved the replacement of fire doors sets to meet current regulations, improvements to fire stopping on compartment lines, and installation of additional emergency lighting to enhance the existing provision.  A full distribution board swap was also undertaken by the Trust during our possession to improve the condition of electrical services in the area.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          All works were undertaken whilst maintaining access throughout to various department staff to the offices and store areas in the ward.  The completed works were handed over to a very satisfied Ward Lead on 5th August, with critical healthcare provision recommencing in the ward the same day as intended. People who depend on this critical infrastructure, depend on us, and we understand this responsibility. A huge thank you to the team who excelled yet again.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/IMG_0031-5B1-5D-7067203a.jpg" length="361364" type="image/png" />
      <pubDate>Wed, 05 Aug 2020 15:25:07 GMT</pubDate>
      <guid>https://www.hanevo.com/neonatal-intensive-care-unit-nicu-upgrade-complete</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/IMG_0031-5B1-5D-0ac5b1c4.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/IMG_0031-5B1-5D-7067203a.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Work Concludes at Woodlands Edge</title>
      <link>https://www.hanevo.com/work-continues-at-woodlands-edge</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;a&gt;&#xD;
    &lt;img src="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/IMG-20200709-WA0012.jpg" alt=""/&gt;&#xD;
  &lt;/a&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;h3&gt;&#xD;
  
         Work Concludes at Woodlands Edge for HANEVO
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Work has concluded for HANEVO at Woodlands Edge SPS on behalf of Wessex Water.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The project includes the Installation of new wet well, new pumps and pipework and the backfill of an old wet well.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Also installed was a new kiosk base and kiosk complete with pump panel and telemetry. Further installation of chains / floats and technocover onto a concrete slab - complete with davit socket rounded off this phase.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          NICEIC certificate produced and Davit lifting socket load tested and certificate provided in the O&amp;amp;M.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/IMG-20200709-WA0013.jpg" length="343710" type="image/jpeg" />
      <pubDate>Thu, 23 Jul 2020 22:29:43 GMT</pubDate>
      <guid>https://www.hanevo.com/work-continues-at-woodlands-edge</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/IMG-20200709-WA0013.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/IMG-20200709-WA0013.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>COVID-19 Workplace Precautions</title>
      <link>https://www.hanevo.com/covid-19-precautions</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Actions taken at HANEVO to protect our engineers, clients and the general public.
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         At HANEVO we will be reviewing and following Governmental advice from across the UK, to ensure our engineers are operating as professionally as possible to help contain and reduce the risk of infection from Coronavirus.
         &#xD;
  &lt;br/&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The Government’s construction-specific guidance (the Construction Workplace Safety Guidance) outlines the following measures that employers should take:
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;ul&gt;&#xD;
      &lt;li&gt;&#xD;
        &lt;span&gt;&#xD;
          
             Introducing one-way flow-through areas and floor markings to maintain social distancing (where possible).
            &#xD;
        &lt;/span&gt;&#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        &lt;span&gt;&#xD;
          
             Minimising the number of unnecessary visits to the worksite. Where site visits are required, making sure customers, visitors and contractors understand how to maintain safety.
            &#xD;
        &lt;/span&gt;&#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        &lt;span&gt;&#xD;
          
             Further increasing the frequency of hand washing and surface cleaning and avoiding surface transmission when goods enter and leave the site.
            &#xD;
        &lt;/span&gt;&#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        &lt;span&gt;&#xD;
          
             To reduce the risk of aerosol transmission, refraining from playing music or broadcasts that mean workers need to shout to be heard.
            &#xD;
        &lt;/span&gt;&#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        &lt;span&gt;&#xD;
          
             Sharing the results of risk assessments with the workforce.
            &#xD;
        &lt;/span&gt;&#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
      &lt;li&gt;&#xD;
        &lt;span&gt;&#xD;
          
             Ensuring workers who have symptoms or who live with others who have symptoms stay at home and are tested under the Government’s test and trace service.
            &#xD;
        &lt;/span&gt;&#xD;
        &lt;br/&gt;&#xD;
      &lt;/li&gt;&#xD;
    &lt;/ul&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          HANEVO will continually review our processes and procedures based upon advice from the Government.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/photo-1584265549884-cb8ea486a613-cd77b2d9.jpg" length="849469" type="image/png" />
      <pubDate>Wed, 15 Jul 2020 13:56:16 GMT</pubDate>
      <guid>https://www.hanevo.com/covid-19-precautions</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/photo-1584265549884-cb8ea486a613-4ffb140a.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/photo-1584265549884-cb8ea486a613-cd77b2d9.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO appoint Big Hill Associates</title>
      <link>https://www.hanevo.com/hanevo-appoint-big-hill-associates</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO appoint Big Hill Associates
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO has appointed Big Hill Associates as their Critical Environment Strategic Consultants.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Having worked with Big Hill Associates’ owner, Jozef Mountain, for many years, the decision to appoint them was an easy one. With increased workload and opportunity HANEVO are delighted to make such a strategic announcement. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Planning and working methodology are critical within the live and occupied environments HANEVO operates. Together with Big Hill Associates’ input, repeat work levels have proven that understanding the sensitivities of where we operate and going the extra mile for our customers is an offering they like and value.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Recent projects completed with Big Hill Associates acting in a consultant role include works on multiple critical public facing contracts at the Whittington Health NHS Trust and facilities upgrade works at Princess Alexandra Hospital, Harlow and at Chelsea &amp;amp; Westminster Hospital.  
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          With our combined knowledge and proven success in construction solutions, this partnership will assist in meeting HANEVO’s growth targets across the Critical Environment sector. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1591453214154-c95db71dbd83.jpg" length="124792" type="image/jpeg" />
      <pubDate>Wed, 24 Jun 2020 13:06:28 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-appoint-big-hill-associates</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1591453214154-c95db71dbd83.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1591453214154-c95db71dbd83.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO Advance Woodlands Edge Pump Station</title>
      <link>https://www.hanevo.com/hanevo-advance-woodlands-edge-pump-station</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO Advance Woodlands Edge Pump Station
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO has advanced the installation of a new pump station at Woodland Edge on behalf of Wessex Water. The project includes all Civil, M&amp;amp;E and Controls required under the contract.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The project is interesting due to the tight space, live utilities, and the fact the location has a TPO (Tree preservation Order) due to a tight knit arrangement of trees within the compound. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          HANEVO has worked closely with the local council on the relocation of one tree. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Health and Safety considerations in such a confined location were paramount in project planning. When complete the station will include new civils, chambers, pumps, panel, and associated controls.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Elizabeth Yates and Richard Gray, Project Managers for HANEVO in the Wessex region, noted it was one on many interesting projects being successfully delivered for Wessex over the past 12 months. 
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Woodlands-215d43dc.png" length="681290" type="image/png" />
      <pubDate>Sun, 21 Jun 2020 23:36:17 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-advance-woodlands-edge-pump-station</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Woodlands-215d43dc.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Woodlands-215d43dc.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO staff and Covid-19</title>
      <link>https://www.hanevo.com/hanevo-staff-and-covid-19</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO staff and Covid-19
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         The majority of HANEVO work is undertaken on “essential services” with much of what we do being of critical importance to essential infrastructure. Through following government guidelines and implementing safe systems of work we have continued to support our clients throughout Covid-19.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Our staff have been at the forefront of this effort and their commitment to our clients has not gone unnoticed with messages of thanks being received daily for their efforts and professionalism and safety approach.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Contract awards have continued throughout Covid-19 thanks to their dedication. We are proud of our staff for their consistency and we say “thank you” to them and our clients for demonstrating that a collaborative approach can overcome the toughest of challenges.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1585421514416-8445a64ef90b.jpg" length="115936" type="image/jpeg" />
      <pubDate>Wed, 13 May 2020 15:05:35 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-staff-and-covid-19</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1585421514416-8445a64ef90b.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1585421514416-8445a64ef90b.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Wessex Water Telford Depot</title>
      <link>https://www.hanevo.com/wessex-water-telford-depot</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Wessex Water Telford Depot
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Having recently completed numerous Sewage Treatment office &amp;amp; welfare works for Wessex Water, southern region, HANEVO has now been awarded depot improvement works on similar sites.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
    &lt;div&gt;&#xD;
      
           When submitting our tender we were careful to consider Current Electrical Regulations, CDM Regulations 2015  and Wessex Water Specifications and are delighted to be undertaking the Telford Depot improvement works, in collaboration with D. P. Burridge Ltd.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
            
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           Our scope of works includes refurbishment of office, corridor, kitchen, mains room and toilet areas. Heating and fire detection will be provided throughout and a new ceiling provided to the Mezzanine area.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           A special thanks, as these work awards are only possible due to the attitude demonstrated by our staff in providing a service to Wessex Water that showcases HANEVO’s qualities in full.
          &#xD;
    &lt;/div&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Workscope.png" length="526041" type="image/png" />
      <pubDate>Wed, 13 May 2020 13:02:23 GMT</pubDate>
      <guid>https://www.hanevo.com/wessex-water-telford-depot</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Workscope.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Workscope.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO awarded Asbestos Removal works</title>
      <link>https://www.hanevo.com/hanevo-awarded-asbestos-removal-works</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO awarded Asbestos Removal works
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Hanevo has been awarded further new critical environmental work at the Whittington Hospital in London. Currently carrying out various large infrastructure works for the NHS, Hanevo were ideally placed to work with the client to remove asbestos found in a section of the hospital, to allow originally planned maintenance work to continue.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The work involves isolation of part of the hospital unit that prepares and sends out the daily meal requirements for the whole hospital. The initial works are to seal off access to allow the safe removal of the asbestos and setup of the de-contamination unit and other essential plant. Once this has been completed, the secondary task of continuing with the fire improvements to the infrastructure can commence. This work impinges on the day to day access of all hospital personnel, patients and visitors alike, so Hanevo planned and worked with the hospital project team to ensure that it is done in a safe and considerate manner.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          In this difficult time, Hanevo are working closely with the hospital to continue safe working across all the various work elements that are required to be completed.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          This work includes assisting with provision of facilities for the influx of Covid-19 testing.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Visiting+and+Visting+Times+w300.jpg" length="17880" type="image/jpeg" />
      <pubDate>Mon, 11 May 2020 12:33:51 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-asbestos-removal-works</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Visiting+and+Visting+Times+w300.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Visiting+and+Visting+Times+w300.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO awarded Budds Farm Contract</title>
      <link>https://www.hanevo.com/hanevo-awarded-budds-farm-contract</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO awarded Budds Farm Contract
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Hanevo has recently been awarded further mechanical design works at our Budds Farm project on behalf of Galliford Try. Already carrying out the electrical installation of the works, Hanevo were perfectly placed to assist our client at short notice in these unprecedented times. The works consist of the design of the pipe work and process feeds for a newly constructed digestion system as part of the AMP 6 framework with GT/ Southern Water. Pipe sizes range from 80mm to 200mm.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The contract covers the design of nearly a kilometre of internal and external pipework.  It involves the recirculation lines and hot and cold water supplies to the new heat exchanger. Also included is the design of the gas line to tie into the existing gas network on site.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/full_34439-6321d407.jpg" length="314767" type="image/png" />
      <pubDate>Mon, 11 May 2020 11:22:54 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-budds-farm-contract</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/full_34439-f9e687ea.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/full_34439-6321d407.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Solid Performance at HANEVO</title>
      <link>https://www.hanevo.com/solid-performance-at-hanevo</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         Solid Performance at Hanevo
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Recently filed accounts for HANEVO record a solid turnaround in trading performance.
         &#xD;
  &lt;div&gt;&#xD;
    
          The nine months trading period YE 31st December 2019 showed a like for like revenue increase
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          of over 40% with solid pre-tax profits of 5%. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The Board, acknowledging the improved performance, expressed confidence that subject to a solid pipeline turning into orders, their plan to sustainably grow the business in the next 5 years to £50m revenue is ahead of schedule.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1460925895917-afdab827c52f.jpg" length="242353" type="image/jpeg" />
      <pubDate>Sat, 18 Apr 2020 09:21:32 GMT</pubDate>
      <guid>https://www.hanevo.com/solid-performance-at-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1460925895917-afdab827c52f.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1460925895917-afdab827c52f.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO to Open New Back Office</title>
      <link>https://www.hanevo.com/hanevo-to-open-new-back-office</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO to Open New Back Office
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Once Covid 19 guidelines allow and it is safe to do so, Hanevo are ready to open their new Back office
         &#xD;
  &lt;div&gt;&#xD;
    
          in Charleville, Co. Cork, Ireland. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The new office is headed up by Liam McCarthy who recently joined Hanevo as 
          &#xD;
    &lt;span&gt;&#xD;
      
           Lead Financial Accountant. Liam is joined in Charleville by Grainne Hanley who will head up 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Procurement and Administration. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The move will allow Hanevo focus on their UK activities 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           at point of need while centralising off site functions. The move will pay dividends for clients by improving support 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           to the site based project delivery teams. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Jim Drain, Hanevo HR manager, noted the move is one of a number of 
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      
           new support initiatives planned for the current calendar year as Hanevo continue to ramp up their UK activity post Covid 19.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/photo-1584259432511-f5ddd42e553f-5d450b7c.jpg" length="2025275" type="image/png" />
      <pubDate>Tue, 07 Apr 2020 09:13:14 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-to-open-new-back-office</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/photo-1584259432511-f5ddd42e553f-4bdd4094.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/photo-1584259432511-f5ddd42e553f-5d450b7c.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO “key workers” designation by Wessex Water</title>
      <link>https://www.hanevo.com/hanevo-key-workers-designation-by-wessex-water</link>
      <description>Water and sewerage utilities have been included in the UK Governments “key workers” list.</description>
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO “key workers” designation by Wessex Water
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Water and sewerage utilities have been included in the UK Governments “key workers” list.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          Hanevo plays an integral role in supporting Wessex Water as part of their supply chain and we continue to undertake site based activities to maintain the Water and Sewage network.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          We support Wessex Water whilst complying with the latest Government guidance on COVID 19.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          We are proud of our “key workers” staff who have been kindly thanked by Wessex for their efforts, a nice gesture by a valued client.
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1533077162801-86490c593afb.jpg" length="685326" type="image/jpeg" />
      <pubDate>Mon, 06 Apr 2020 08:38:54 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-key-workers-designation-by-wessex-water</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1533077162801-86490c593afb.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1533077162801-86490c593afb.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANEVO awarded important Whittington Health NHS Trust project</title>
      <link>https://www.hanevo.com/hanevo-awarded-important-whittington-health-nhs-trust-project</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         HANEVO awarded important Whittington Health NHS Trust project
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  
         Whittington Health NHS Trust have awarded Hanevo another important project at their Northern Health Centre on Holloway Road. The project involves the adaption of rooms associated with the Islington Child &amp;amp; Adolescent Mental Health (CAMHS) provision, to modify the services, building fabric, fixtures and fittings to suit the Trust requirements.
         &#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          The project is one of many carried out for the Trust by Hanevo over the past 2 years and was awarded on the back of our excellent reputation and partnership on their estate.  Works are due to commence in the coming weeks and expected to take around 1 month to complete.  Features include the requirement for specialist equipment, proprietary furniture and bespoke on site adaptions to provide innovative solutions around retained building services equipment.  All works will be carried out in a live healthcare environment, putting patient care and service provision at the fore of our on-site practices, through flexible working and sensitivity to all stakeholder needs.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
           
         &#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Whittington-682d588b-c9769ebe.jpg" length="300921" type="image/png" />
      <pubDate>Mon, 06 Apr 2020 08:34:27 GMT</pubDate>
      <guid>https://www.hanevo.com/hanevo-awarded-important-whittington-health-nhs-trust-project</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Whittington-682d588b-c9769ebe.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/Whittington-682d588b-c9769ebe.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>COVID-19 Update</title>
      <link>https://www.hanevo.com/covid-19-update</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  
         HANEVO wish all our staff, suppliers, partners and clients best wishes and good health in these very difficult Covid 19 times. Please be careful.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          We are open for business in accordance with all Government and Industry safety guidelines and wish to put on record our sincere thanks to our dedicated staff. 
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          We also take the opportunity to acknowledge our clients who have worked closely with us in mitigating and minimising the disruption and assure them we will work tirelessly on their behalf.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          We will continue to build trusted relationships and demonstrate that in times of crisis, as in all times, HANEVO will work with integrity and help whenever and wherever we can.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1507413245164-6160d8298b31.jpg" length="494271" type="image/jpeg" />
      <pubDate>Fri, 03 Apr 2020 11:50:12 GMT</pubDate>
      <guid>https://www.hanevo.com/covid-19-update</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1507413245164-6160d8298b31.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1507413245164-6160d8298b31.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>2019 Christmas Wish From HANEVO</title>
      <link>https://www.hanevo.com/2019-christmas-wish-from-hanevo</link>
      <description />
      <content:encoded>&lt;h3&gt;&#xD;
  
         A Christmas Wish from HANEVO
        &#xD;
&lt;/h3&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;span&gt;&#xD;
    
          For Christmas 2019, HANEVO would like to wish all our clients, suppliers, staff and partners a very peaceful and Happy Christmas. This is a time of year when we can reflect on our year past and look forward with hope and excitement to the year ahead. 
         &#xD;
  &lt;/span&gt;&#xD;
  &lt;br/&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    
          We at HANEVO take time to say Thanks for all we have, and we think of all those who are less fortunate than we are. We will contribute this Christmas to worthy causes as selected by our staff.
         &#xD;
  &lt;/div&gt;&#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/photo-1512911122913-094837b6fd2f-d4b47967.jpg" length="3931790" type="image/png" />
      <pubDate>Mon, 16 Dec 2019 10:12:47 GMT</pubDate>
      <guid>https://www.hanevo.com/2019-christmas-wish-from-hanevo</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/photo-1529973625058-a665431328fb-ccf108ba.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/5c7acd3f/dms3rep/multi/photo-1512911122913-094837b6fd2f-d4b47967.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>HANLEY GROUP acquires UKSE Contract Division</title>
      <link>https://www.hanevo.com/hanley-group-acquires-ukse-contract-division</link>
      <description />
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  
         HANLEY GROUP has announced the acquisition of the projects division of UKSE through its investment arm Carlton Initiatives Ltd.
         &#xD;
  &lt;div&gt;&#xD;
    &lt;br/&gt;&#xD;
    &lt;div&gt;&#xD;
      
           UKSE Group owner Martin Wood remains owner of the UKSE Labour Supply Company while the projects arm acquired by HANLEY GROUP has been rebranded as HANEVO LTD. 
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           Mr. Wood remains a shareholder and Director of HANEVO and noted that the move will allow him to focus on his Labour Supply Company while availing of the support and network of the HANLEY GROUP.
           &#xD;
      &lt;b&gt;&#xD;
        
            “Hanley Group have worked on this acquisition for six months and watching how they dealt with our staff and their sincerity in making this move a win for all of us only reinforced my belief that the time was right to sell our projects arm and that HANLEY GROUP were the perfect partner. I look forward to helping the business in any way I can moving forward and know our clients will benefit from this move”.
           &#xD;
      &lt;/b&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           Sorcha Hanley, Operations Manager at HANLEY GROUP noted that the acquisition makes sense for the group as their origins are in the Water, Critical Environment and M&amp;amp;E sectors.
           &#xD;
      &lt;b&gt;&#xD;
        
            “Working with Martin has been a breath of fresh air as his client focussed vision sits easily with ours which has allowed us to flourish. We have already added to HANEVO’s management and we will be adding to the workforce at all levels in the coming months”. 
           &#xD;
      &lt;/b&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           Darren Hedges, Hanevo Operations Director noted,
           &#xD;
      &lt;b&gt;&#xD;
        
            “The move is a great opportunity for us build on our commitment to the market. HANEVO will focus on the Water, Critical Environment and MEICA sectors. All our activity is Team Driven and Client-Focussed and we look forward to embracing these exciting times”.
           &#xD;
      &lt;/b&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      
           With significant Clients such as Wessex Water, Southern Water, Galliford Try and the NHS to name but a few, HANEVO will embrace the challenge to become a market leader. Located in Alton, Hampshire, HANEVO are currently sourcing new offices in London and Ireland.
          &#xD;
    &lt;/div&gt;&#xD;
    &lt;div&gt;&#xD;
      &lt;br/&gt;&#xD;
      &lt;div&gt;&#xD;
        &lt;div&gt;&#xD;
          &lt;br/&gt;&#xD;
        &lt;/div&gt;&#xD;
      &lt;/div&gt;&#xD;
    &lt;/div&gt;&#xD;
  &lt;/div&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1501324682324-0d8d7c4b9706.jpg" length="212701" type="image/jpeg" />
      <pubDate>Fri, 13 Sep 2019 21:52:02 GMT</pubDate>
      <guid>https://www.hanevo.com/hanley-group-acquires-ukse-contract-division</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1501324682324-0d8d7c4b9706.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp-cdn.multiscreensite.com/md/unsplash/dms3rep/multi/photo-1501324682324-0d8d7c4b9706.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
